Nigeria · Federal Infra / Reforms Register

The works of the Fourth Republic.

Every major federal project since Nigeria's return to democracy in 1999 — rail, roads, power, ports, pipelines and reforms — plus everything under construction right now. Dated, costed, sourced, and demarcated by the president who delivered each one.

143
Projects tracked
34 ⏳
Under construction
1999—now
Fourth Republic
5
Administrations
Five administrations · 1999 – now

Whose pen built what

Jump to any president to see the projects delivered on their watch — or open their full tenure.

Portraits via Wikimedia Commons — Tinubu (Nosa Asemota) & Buhari (Bayo Omoboriowo), CC BY-SA 4.0; Jonathan & Yar'Adua (World Economic Forum), CC BY-SA 2.0; Obasanjo, public domain.

Live · Not yet delivered

Under construction

Consequential projects being built right now. Tracked until they're commissioned and move into the completed record.

Under way Roads & Bridges

Akwanga–Jos–Bauchi–Gombe–Maiduguri Superhighway

A 700 km, five-section superhighway from Akwanga through Jos, Bauchi, Gombe and Biu to Maiduguri, billed as the administration's fourth legacy highway. Section II (Gombe–Biu) was flagged off on 4 June 2026, and Section I (Akwanga–Jos, 125 km) on 1 July 2026, when the President was represented by APC National Chairman Nentawe Yilwatda and ₦111bn was approved for Section I.

Started 2026 ₦111bn approved for Section I (Jul 2026) Nasarawa, Kaduna, Plateau, Bauchi, Gombe and Borno States (Akwanga–Jos–Bauchi–Gombe–Biu–Maiduguri) Tinubu
Read the source
Under way Roads & Bridges

Carter Bridge Demolition and Reconstruction (Lagos)

Federal demolition and replacement of the ageing Carter Bridge linking Lagos Island and the mainland, after technical reviews found its underwater piles and pile caps beyond repair. The new 1.93 km bridge, awarded to CCECC after competitive bidding, adds a flyover ramp and two 105 m navigation spans.

Started 2026 ₦548.98bn (FEC, Apr 2026); ₦5.6bn design consultancy approved Mar 2026 Carter Bridge, Lagos Island (Idumota) – Iddo/Ebute Metta, Lagos State, across the Lagos Lagoon Tinubu
Read the source
Under way Water & Dams

Sustainable Power and Irrigation for Nigeria (SPIN) project

A $500m World Bank-financed project run by the Federal Ministry of Water Resources and Sanitation. It aims to modernise irrigation, improve dam operations and safety, and support hydropower development, building on the earlier TRIMING project. The FG and World Bank inaugurated it on 10 March 2026.

Started 2026 $500m (World Bank) Selected federal dams and irrigation schemes in multiple states Tinubu
Read the source
Under way Roads & Bridges

Calabar–Ebonyi–Benue–Nasarawa–Abuja Superhighway

A legacy superhighway from Calabar through Ebonyi, Benue, Kogi and Nasarawa towards Abuja. Section 1 (118.85 km at flag-off, now given as 123 km, Calabar to the Ebonyi–Benue boundary) was flagged off at Afikpo on 16 April 2025 by Governor Francis Nwifuru on behalf of President Tinubu. Section 2 (178 km, through Benue, Kogi and Nasarawa to Owete) has commenced, and a second carriageway is being procured.

Started 2025 ₦454bn (Section 1) + ₦685bn (Section 2) contract sums Cross River, Ebonyi, Benue, Kogi, Nasarawa and FCT (Calabar to Abuja) Tinubu
Read the source
Under way Power & Energy

Power Sector Debt Reduction Programme (₦4trn bonds)

In July 2025 President Tinubu backed up to ₦4trn of FG-backed bonds to clear verified debts owed to power generation companies and gas suppliers, accumulated mainly from 2015 to 2023. Issued through NBET, Series 1 (₦501bn, January 2026) and Series 2 (₦728.9bn, August 2026, including ₦326.9bn of non-cash bonds) total ₦1.23trn so far. The first coupon, about ₦63.5bn, was paid on 14 July 2026.

Started 2025 Up to ₦4trn authorised; ₦1.23trn issued (Jan & Aug 2026) Nationwide (power generation companies and gas suppliers) Tinubu
Read the source
Under way Roads & Bridges

Lagos–Calabar Coastal Highway

A planned ~750 km six-lane concrete coastal highway from Lagos to Cross River, renamed the President Bola Ahmed Tinubu Coastal Highway in July 2026. Section 1 (47.47 km, Victoria Island–Eleko) is complete, and the Lagos stretch of Sections 1 and 2 (about 103 km) has been opened to traffic while bridges are still being built; sections in Akwa Ibom and Cross River are also in progress.

Started 2024 $747m (Sec 1, Jul 2025) + $1.126bn (Sec 2, Dec 2025) financing closed Coastal corridor: Lagos, Ogun, Ondo, Delta, Edo, Bayelsa, Rivers, Akwa Ibom, Cross River; Section 1 runs Victoria Island–Eleko, Lagos Tinubu
Read the source

Plus 28 more under way — filter the register to “Under way” ↓

The Record · By Builder

Who built what

Every tracked project since 1999, grouped under the president who delivered it — 143 in all. Search or filter to narrow within.

Sector
Status
Route Indicative alignment (not yet built) Completed site Not yet complete
0 on the map · 58 nationwide reforms & programmes are listed below, not pinned
Showing 143 of 143 projects · grouped by president
Olusegun Obasanjo
Olusegun Obasanjo
1999 – 2007 · PDP · 19 projects
Full tenure
2007 Major Reforms National Identity Management Commission Act 2007 The National Identity Management Commission Act No. 23 of 2007, signed on 25 May 2007, created NIMC, the National Identity Database and the National Identification Number (NIN). The NIN later became the basis for SIM-registration linkage and other identity checks. Completed · Jun 2026 — The 2007 Act was repealed and replaced by the NIMC Act 2026, signed by President Tinubu in June 2026. Completed 2007 Major Reforms Federal Inland Revenue Service (Establishment) Act 2007 The Federal Inland Revenue Service (Establishment) Act No. 13 of 2007 gave FIRS administrative and financial autonomy outside the federal civil service. It commenced on 16 April 2007, during President Obasanjo's tenure. Completed · Jun 2025 — Repealed by the Nigeria Revenue Service (Establishment) Act 2025, signed by President Tinubu on 26 June 2025, under which FIRS became the Nigeria Revenue Service (NRS). Completed 2007 Telecom & Digital ·$311m (in-orbit delivery contract, 2004) NigComSat-1 — first communications satellite Nigeria's first geostationary communications satellite, built by China under an in-orbit delivery contract signed by NASRDA and China Great Wall Industry Corp (CGWIC) on 15 December 2004. It was launched from Xichang, China, on 13 May 2007 and handed over in orbit on 6 July 2007, but failed on 11 November 2008 after a solar-array anomaly, about 18 months into a planned 15-year life. Abandoned · Nov 2008 — Delivered in orbit in July 2007 but lost on 11 Nov 2008 after a solar-array failure; replaced by NigComSat-1R, launched 19 Dec 2011. Abandoned 2007 Major Reforms National Economic Empowerment and Development Strategy (NEEDS) National Economic Empowerment and Development Strategy, Nigeria's home-grown poverty-reduction and reform programme for 2004-2007, launched on 29 May 2004. Prepared mainly under Chief Economic Adviser Charles Soludo, it framed the Obasanjo government's privatisation, deregulation and public-finance reforms. Completed · 2007 — The programme period (2004–2007) ended in 2007. Completed 2007 Aviation & Ports ·~₦20bn (~$150m), privately financed Murtala Muhammed Airport Terminal 2 (MMA2) Domestic terminal at Lagos airport developed, financed and operated by Bi-Courtney Aviation Services under a federal build-operate-transfer concession awarded in 2003 for 36 years. It was inaugurated by President Obasanjo on 7 April 2007, with flights starting 7 May 2007; Bi-Courtney describes it as Nigeria's first major DBOT project. Completed · May 2007 — Operating since 7 May 2007; the concession has been the subject of long-running disputes and litigation between Bi-Courtney and the FG/FAAN. Completed 2006 Major Reforms ·$12.4bn paid / $18bn written off Paris Club $18bn debt forgiveness Under an agreement reached in 2005, Nigeria received about $18bn of debt relief from Paris Club creditors in return for paying about $12.4bn in arrears and buy-backs, eliminating about $30bn of Paris Club debt. Nigeria completed its final payment in April 2006, becoming the first African country to fully clear its Paris Club debt. Completed · Apr 2006 — Final payment made in April 2006, ending Nigeria's Paris Club debt. Completed 2006 Telecom & Digital ·$500m (2006 sale to Transcorp, revoked 2009) NITEL/M-Tel privatisation (Transcorp sale) The BPE sold state telecom operator NITEL and its mobile arm M-Tel to Transnational Corporation (Transcorp) for $500m in 2006. The Federal Government revoked the sale in 2009 after the buyer ran into financial difficulties. Abandoned · Jun 2009 — Transcorp sale revoked in 2009; NITEL was later sold to NATCOM for $252.5m (preferred bidder Dec 2014, paid April 2015) and relaunched as ntel. Abandoned 2005 Major Reforms ·₦25bn minimum capital per bank Banking Sector Consolidation (₦25bn minimum capital) The CBN under Governor Charles Soludo raised banks' minimum capital from ₦2bn to ₦25bn in July 2004 with a 31 December 2005 deadline. Mergers, acquisitions and closures reduced the number of banks from 89 to 25. Completed · Dec 2005 — Consolidation deadline passed 31 Dec 2005 with 25 banks remaining; a new recapitalisation round was launched by the CBN in 2024. Completed 2005 Major Reforms National Health Insurance Scheme (NHIS) Created by Decree 35 of 1999, signed by military Head of State Gen. Abdulsalami Abubakar in May 1999, and formally launched by President Obasanjo in June 2005, starting with federal civil servants. Replaced by the National Health Insurance Authority under the National Health Insurance Authority Act signed on 19 May 2022. Completed · May 2022 — Launched June 2005; superseded by the NHIA Act signed on 19 May 2022. Completed 2004 Education & Social Universal Basic Education (UBE) Act Made 9 years of basic education (6 primary + 3 junior secondary) free and compulsory. Created UBEC to administer matching grants to states. Completed · 2004 — Compulsory, Free Universal Basic Education Act 2004 remains in force, with UBEC administering matching grants to states. Completed 2004 Major Reforms ·₦25.9tn pension assets (Aug 2025) Pension Reform Act 2004 — Contributory Pension Scheme Created the Contributory Pension Scheme, the National Pension Commission (PenCom) and licensed Pension Fund Administrators, replacing the unfunded defined-benefit system with portable individual retirement savings accounts. The 2004 Act was later repealed and replaced by the Pension Reform Act 2014. Completed · 2014 — The 2004 Act was repealed and replaced by the Pension Reform Act 2014, under which the contributory scheme continues; PenCom reported pension assets of ₦25.9tn in August 2025. Completed 2004 Major Reforms ·About $5bn recovered under Ribadu (2003–2007) Economic and Financial Crimes Commission (EFCC) Established by the EFCC (Establishment) Act of 12 December 2002 and began operations on 13 April 2003 under pioneer chairman Nuhu Ribadu; the 2002 Act was replaced by the EFCC (Establishment) Act 2004. It investigates financial crimes including money laundering, advance-fee fraud and theft of public funds. Completed · 2004 — The EFCC (Establishment) Act 2004 remains in force; the Center for Global Development credits Ribadu's 2003-2007 tenure with recovering about $5bn in stolen assets. Completed 2003 Telecom & Digital ·$13m (NASRDA) NigeriaSat-1 — first earth-observation satellite Earth-observation microsatellite built by Surrey Satellite Technology (UK) for the National Space Research and Development Agency (NASRDA) as part of the international Disaster Monitoring Constellation. Development started in November 2001 and it was launched from Plesetsk, Russia, on 27 September 2003. Completed · Sep 2003 — Launched 27 Sep 2003 with a 5-year design life; NASRDA later launched NigeriaSat-2 and NigeriaSat-X. Completed 2002 Roads & Bridges Federal Roads Maintenance Agency (FERMA) Established by the Federal Roads Maintenance Agency (Establishment, etc.) Act No. 7 of 2002, assented to by President Obasanjo and amended in 2007, to monitor and maintain the federal road network (about 35,000 km). Completed · 2002 — Act enacted in 2002 and amended in 2007; FERMA continues to operate as the federal road-maintenance agency. Completed 2001 Telecom & Digital ·$285m per licence; winning bids totalled $855m (CIL later defaulted) GSM Liberalisation In a 19 January 2001 auction the NCC sold digital mobile (GSM) licences at $285m each to MTN, Econet (now Airtel) and Communications Investments Ltd (CIL); CIL missed its payment deadline and lost its licence, while NITEL's mobile arm M-Tel received a licence without bidding. Econet and MTN launched commercial services in August 2001, and Globacom entered the market in 2003. Nigeria had about 400,000 active lines before the auction and about 60 million subscribers by 2008. Completed · Aug 2001 — Econet and MTN began commercial GSM services on 7 and 8 August 2001. Completed 2000 Major Reforms Niger Delta Development Commission (NDDC) Established by the NDDC Act 2000 to coordinate development of the nine oil-producing Niger Delta states. Funded by 15% of the federal monthly statutory allocations due to member states, 3% of the total annual budget of oil and gas companies operating in the region, and 50% of ecological-fund allocations due to member states. Completed · 2000 — Act in force since 2000; FG and oil-company remittance shortfalls were repeatedly reported (e.g. ThisDay, April 2023). Completed 2000 Major Reforms Independent Corrupt Practices Commission (ICPC) Federal anti-corruption commission established under the Corrupt Practices and Other Related Offences Act 2000 and inaugurated on 29 September 2000. It investigates and prosecutes corruption offences, reviews corruption-prone systems in public bodies and runs public education. Completed · Sep 2000 — Inaugurated 29 Sep 2000 under the ICPC Act 2000; the commission remains active. Completed 2006 Rail ·$8.3bn (2006 contract) Lagos–Kano standard-gauge railway contract (CCECC, 2006) In 2006 the Federal Government awarded China Civil Engineering Construction Corporation (CCECC) an $8.3bn contract for a new standard-gauge railway from Lagos to Kano. Funding for the whole line could not be secured, so the project was later split into segments and the old narrow-gauge line rehabilitated in the meantime. Abandoned — The single 2006 contract was not executed as awarded; the line was instead built in segments under later contracts, with Abuja–Kaduna opening on 26 July 2016, Lagos–Ibadan on 10 June 2021, and Kaduna–Kano still under construction in October 2026. Abandoned 2004 Power & Energy ·US$2.5bn initial funding approved Aug 2005 (Excess Crude Account) National Integrated Power Project (NIPP) — initiation Conceived in 2004 as a fast-track, government-funded programme to build ten gas-fired power stations, with transmission, distribution and gas links, while the private-sector power reforms took effect. In August 2005 the National Council of State and National Assembly approved initial funding of US$2.5bn from the Excess Crude Account, and the Niger Delta Power Holding Company (NDPHC) owns the plants: Calabar (Odukpani), Egbema, Ihovbor (Benin), Sapele (Ogorode), Alaoji, Gbarain, Omoku, Omotosho, Olorunsogo and Geregu. Partly open · Sep 2026 — NDPHC said in September 2026 that 7 of the 10 plants are commercially operational, 2 still under construction and 1 being upgraded, with much capacity stranded by low grid dispatch. Partly open
Umaru Musa Yar'Adua
Umaru Musa Yar'Adua
2007 – 2010 · PDP · 4 projects
Full tenure
2009 Major Reforms Niger Delta Amnesty Programme Amnesty and unconditional pardon for Niger Delta militants announced by President Yar'Adua in June 2009 under Section 175 of the Constitution, followed by a disarmament, demobilisation and reintegration programme. More than 30,000 people registered between October 2009 and May 2011 in exchange for monthly stipends, training and other support. Completed · Jun 2009 — Amnesty announced in June 2009; the programme has been continued by later administrations. Completed 2009 Major Reforms ·Over ₦600bn (incl. ₦400bn into the first five banks) Banking Crisis Rescue (Sanusi era) After special audits of all banks in 2009, the CBN under Governor Sanusi Lamido Sanusi removed the chief executives and boards of eight distressed banks, starting with five (Afribank, Finbank, Intercontinental, Oceanic and Union Bank) on 14 August 2009, and injected over ₦600bn of support. The crisis response led to the creation of AMCON in 2010 to buy the banks' bad loans. Completed · Aug 2011 — In August 2011 the licences of three rescued banks were revoked and their assets moved to new bridge banks (Mainstreet, Keystone, Enterprise), which AMCON capitalised. Completed 2008 Major Reforms ·↳ began under Obasanjo Infrastructure Concession Regulatory Commission (ICRC) The Infrastructure Concession Regulatory Commission (Establishment, etc.) Act 2005, signed by President Obasanjo, created a federal regulator for public-private partnership concessions. The Commission and its governing board were inaugurated on 27 November 2008 under President Yar'Adua. Completed · Nov 2008 — Operational since 27 Nov 2008; the ICRC continues to regulate federal PPP projects. Completed 2007 Major Reforms ·↳ began under Obasanjo Public Procurement Act 2007 Passed by the Senate on 17 May 2007 and the House of Representatives on 30 May 2007, and signed into law by President Yar'Adua on 4 June 2007, following procurement reforms begun under President Obasanjo. Created the National Council on Public Procurement and the Bureau of Public Procurement and set rules for open competitive bidding, thresholds and tenders boards in federal contracting. Completed · Jun 2007 — Act in force since 4 June 2007; the Bureau of Public Procurement regulates federal procurement under it. Completed
Goodluck Ebele Jonathan
Goodluck Ebele Jonathan
2010 – 2015 · PDP · 18 projects
Full tenure
2023 Power & Energy ·$1.3bn Zungeru Hydropower Project (700 MW) — construction commenced Construction of the 700 MW Zungeru hydropower plant on the Kaduna River, Niger State, began under President Jonathan in 2013, with a CNEEC–Sinohydro consortium as contractor and a $1.3bn cost financed 75% by a China EXIM Bank loan and 25% by the federal government. Construction was completed in 2023, and operations were handed to concessionaire Penstock Ltd (Mainstream Energy Solutions) on 23 January 2024. Completed · Oct 2026 — This entry is the 2013 construction start; the plant has been in service under Penstock since January 2024, and in October 2026 the ICRC said it was generating only about 350 MW of its 700 MW capacity. Completed 2022 Aviation & Ports 4-Airport Terminal Modernisation — China EXIM framework (Lagos, Abuja, Kano, Port Harcourt) China EXIM Bank-financed programme announced by Aviation Minister Stella Oduah in September 2012 to build new international terminals at Lagos, Abuja, Kano and Port Harcourt, with CCECC as contractor; construction began in late 2013. The terminals were completed under Buhari: Port Harcourt (Oct 2018), Abuja (Dec 2018) and Lagos (Mar 2022), with Kano reported complete by March 2022. Completed · Mar 2022 — This entry is the Jonathan-era contract and financing milestone; the last terminal commissioned was Lagos on 22 March 2022, when Kano was described as completed and awaiting commissioning. Completed 2021 Rail ·$1.487bn (contract sum) ·↳ began under Obasanjo Lagos-Ibadan SGR contract award ($1.487bn) In July 2012 the Federal Executive Council approved, and the government signed, a $1.487bn contract with CCECC for the 156 km Lagos–Ibadan double-track standard-gauge line, renewing CCECC's 2006 Lagos–Kano award. Funding delays held up works until construction began in March 2017 under Buhari, and the line was commissioned in June 2021. Completed · Jun 2021 — This entry is the 2012 contract award; the line it covers was commissioned in June 2021 and is in passenger service. Completed 2016 Rail ·~$874m ($500m China EXIM loan) Abuja-Kaduna SGR construction commences Construction of the 186.5 km Abuja (Idu)–Kaduna standard-gauge line, Nigeria's first new SGR build, began on 20 February 2011, with CCECC as contractor. It was financed by a $500m China EXIM preferential buyer's credit signed in December 2010, with the federal government funding the balance of the roughly $874m cost. Civil works were completed in December 2014 and commercial service began on 28 July 2016 under Buhari. Completed · Jul 2016 — This entry is the 2011 construction start; the line has been in commercial service since July 2016. Completed 2015 Education & Social ·~₦15bn (allocated) Almajiri / Tsangaya Model Schools Programme Federally funded model boarding schools across northern states combining Qur'anic and basic education, launched by President Jonathan at Gagi, Sokoto State, on 10 April 2012 and delivered through UBEC, with about ₦15bn invested out of a planned 400 schools. Many of the schools were later found decaying, under-used or converted to conventional schools. Stalled · Nov 2017 — A November 2017 Daily Trust investigation found many of the schools decaying, under-used or converted to conventional schools. Stalled 2015 Major Reforms Subsidy Reinvestment and Empowerment Programme (SURE-P) Launched in January 2012 after the partial petrol subsidy removal that set off the Occupy Nigeria protests, to reinvest the federal share of subsidy savings in infrastructure and social programmes. Its projects included funding for the East-West Road dualisation, maternal and child health and graduate internship schemes. Completed · 2015 — SURE-P was still funding projects such as the East-West Road in December 2014 and was wound down after the 2015 change of government. Completed 2015 Power & Energy ·↳ began under Obasanjo National Integrated Power Project (NIPP) — 10 power plants Ten federally funded gas-fired power plants (Olorunsogo II, Omotosho II, Calabar, Geregu II, Egbema, Alaoji, Ihovbor, Sapele II, Gbarain and Omoku II), conceived in 2004 under Obasanjo and largely built and commissioned during the Jonathan tenure. NDPHC station data give about 4,890 MW ISO-rated capacity for nine of the plants, with Geregu II rated at 434 MW. The plants are owned and operated by the Niger Delta Power Holding Company (NDPHC). Completed · May 2016 — In May 2016 NDPHC said eight NIPP plants were ready to generate about 2,000 MW, with gas supply, security and grid constraints limiting output. Completed 2014 Major Reforms Nigeria Industrial Revolution Plan (NIRP) 2014 Federal industrial policy launched in 2014 by the Federal Ministry of Industry, Trade and Investment to raise manufacturing's share of the economy. Completed · 2014 — Adopted as federal industrial policy in 2014. Completed 2013 Power & Energy ·$2.53bn (asset sale proceeds) Power Sector Privatisation (PHCN unbundling) PHCN was unbundled into 18 successor companies (6 GenCos, 11 DisCos and the state-retained Transmission Company of Nigeria), and the sale of 14 of them raised about $2.53bn ($1.27bn GenCos, $1.26bn DisCos). New owners took over the privatised GenCos and DisCos on 1 November 2013, and more than 47,000 PHCN staff were paid severance. Completed · Nov 2013 — New private owners formally took over the privatised GenCos and DisCos on 1 November 2013; TCN remains government-owned. Completed 2012 Major Reforms 2012 Petrol Subsidy Removal (partial) On 1 January 2012 the federal government removed the petrol subsidy, and pump prices rose from ₦65 to at least ₦141 per litre, setting off the Occupy Nigeria protests and a nationwide strike. On 16 January President Jonathan announced a partial reversal of the price rise, and the subsidy was not fully removed until 2023. Completed · Jan 2012 — On 16 January 2012 the government partially reversed the price increase after two weeks of protests and strikes; the policy was later superseded by the 2023 full removal. Completed 2012 Major Reforms ·$1bn seed capital Sovereign Wealth Fund Act 2011 — NSIA The NSIA (Establishment) Act, signed in May 2011, created the Nigeria Sovereign Investment Authority to invest surplus oil revenue through three funds: the Stabilisation Fund, the Future Generations Fund and the Nigeria Infrastructure Fund. NSIA began operations in October 2012 with $1bn seed capital. Completed · Oct 2012 — The Act is in force; NSIA has operated since October 2012 and allocated its $1bn seed capital across the three funds in May 2013. Completed 2012 Roads & Bridges ·Concession: ₦4bn initial investment; FG expects ₦23bn over 30 years (2022) Onitsha River Port – rehabilitation and 30-year concession The Onitsha inland river port in Anambra State was built in 1983 but lay unused until the Jonathan administration rehabilitated and commissioned it in 2012. In July 2022 it was concessioned for 30 years to Universal Elysium Consortium, which pledged an initial ₦4bn investment. Operations remain seasonal and depend on River Niger water levels. Completed · Aug 2025 — In August 2025 the first barge of the year berthed with tiles from Ajaokuta. The port manager cited insecurity, low patronage and the lack of dredging. Completed 2011 Telecom & Digital ·Insurance-funded (failed NigComSat-1 cost $257m) ·↳ began under Yar'Adua NigComSat-1R replacement satellite Replacement for NigComSat-1, which failed in orbit in 2008, launched on 19 December 2011 on a Chinese Long March rocket from Xichang. The insurer of the first satellite paid for it; it has a 15-year design life and operates at 42.5°E. Completed · Dec 2011 — Launched 19 December 2011 and still listed by NigComSat Ltd as its operational satellite; its 15-year design life ends around 2026. Completed 2010 Major Reforms ·₦4.02tn NPLs (book value) bought for ₦1.76tn ·↳ began under Yar'Adua Asset Management Corporation of Nigeria (AMCON) Act 2010 Proposed after the CBN's 2009 bank interventions under President Yar'Adua and signed into law by President Goodluck Jonathan on 19 July 2010, after Yar'Adua's death in May 2010. AMCON bought non-performing bank loans with a book value of about ₦4.02tn for about ₦1.76tn, paid in zero-coupon bonds, and capitalised three bridge banks. Completed · Jul 2010 — Act in force since 19 July 2010 and amended in 2015, 2019 and 2021; AMCON continues recovering debts in 2026. Completed 2010 Aviation & Ports Total Radar Coverage of Nigeria (TRACON) Total Radar Coverage of Nigeria (TRACON), a Nigerian Airspace Management Agency project to provide radar surveillance of Nigerian airspace and modern air-traffic systems at Nigerian airports. It was commissioned by President Goodluck Jonathan on 18 October 2010. Completed · Oct 2010 — Commissioned 18 October 2010; NAMA continues to operate and upgrade TRACON infrastructure. Completed 2012 Power & Energy ·$5.792bn (2017 EPC contract) ·↳ began under Obasanjo Mambilla Hydropower Project (3,050 MW) — 2012 settlement and re-scoping In 2012 the Jonathan government revived the long-delayed Mambilla project on the Mambilla Plateau, Taraba State: capacity was re-scoped to 3,050 MW, and a settlement and General Project Execution Agreement was signed with Sunrise Power and its Chinese partners in November 2012. The current $5.792bn EPC contract with a CGGC–Sinohydro–CGCOC consortium was approved by the FEC in 2017 under Buhari, and no main construction has started. Stalled · Sep 2026 — This entry is the 2012 agreement; the project remains in pre-construction, and on 18 September 2026 an ICC tribunal rejected Sunrise Power's $2.35bn claim, which the President said cleared the main legal obstacle. Stalled 2011 Aviation & Ports Remodelling of 22 federal airports Programme begun in 2011 under Aviation Minister Stella Oduah to rehabilitate terminals at 22 federal airports. A first phase of terminal facelifts was carried out, but by 2016 only 6 of 192 second-phase contracts were reported completed, leaving a reported ₦174bn debt overhang. The new China EXIM-financed international terminals are a separate entry. Stalled · Apr 2016 — The successor minister halted the programme after 2014; a 2016 report found only 6 of 192 phase-two contracts completed. Stalled 2006 Roads & Bridges ·↳ began under Obasanjo East-West Road dualisation (Warri–Port Harcourt–Oron) Dualisation of the roughly 338 km East-West Road from Effurun (Warri) through Kaiama, Ahoada, Port Harcourt and Eket to Oron, in four sections, awarded in 2006. SURE-P funding from 2012 lifted overall completion from 47% to 82% by December 2014; remaining sections, including the Eleme–Onne reconstruction, are still being completed. Partly open · Mar 2026 — In March 2026 the completion target for the Eleme–Onne section was pushed to December 2026; the Eket-bound carriageway there is done and works continue on the Port Harcourt-bound lane. Partly open
Muhammadu Buhari
Muhammadu Buhari
2015 – 2023 · APC · 48 projects
Full tenure
2026 Roads & Bridges ·~₦280bn (FEC-approved 2024 revised cost; FG–NLNG 50:50) ·↳ began under Jonathan Bodo–Bonny Road and Bridges — 2017 construction start 37.9 km road linking Bonny Island, site of the NLNG plant, to the mainland at Bodo in Gokana LGA, Rivers State, with creek bridges and a ~750 m bridge over the Opobo Channel. Awarded in 2014, it was built by Julius Berger from October 2017 under President Buhari and funded 50:50 by the Federal Government and NLNG. It was opened to traffic in December 2025 under President Tinubu and declared completed in June 2026. Completed · Jun 2026 — Opened to traffic in December 2025; Julius Berger declared the road completed in June 2026 with minor finishing works outstanding, and a Phase 2 has been approved. Completed 2023 Major Reforms ·97m+ NIN records by March 2023 (from 41.5m) National ID Number (NIN) — SIM linkage drive Federal directive of December 2020 requiring every SIM card to be linked to a National Identification Number, alongside enforcement by the NCC. The Presidency said NIN records rose from 41.5m to more than 97m by March 2023, and the NIN became a requirement for passports, driving licences and exam registration. Completed · Sep 2024 — A NIN–SIM verification exercise that closed on 14 September 2024 removed 64.3 million unverified lines from operators' databases. Completed 2023 Oil & Gas ·~$19–20bn (private investment) Dangote Petroleum Refinery (650,000 bpd, private) Privately owned 650,000 bpd single-train refinery and petrochemical complex in the Lekki Free Zone, Lagos, built by Dangote Industries; it is not a federal project, although NNPC was approved in 2021 to buy a minority stake. Commissioned by President Buhari on 22 May 2023, it began processing crude in January 2024 and petrol production in September 2024. Completed · May 2023 — Commissioned 22 May 2023 and in operation since 2024. Completed 2023 Roads & Bridges ·$1.5bn (PPP; private and bank financing) Lekki Deep Sea Port Nigeria's first deep-sea port, at Ibeju-Lekki, Lagos, developed as a public-private partnership: Lekki Port Investment Holding (China Harbour Engineering Company and Tolaram) holds 75%, the Lagos State Government 20% and the federal government, through the NPA, 5%. It is largely privately financed rather than a federal capital project. Inaugurated by President Buhari in January 2023, it began commercial operations in April 2023. Completed · Apr 2023 — In commercial operation since April 2023. Completed 2023 Major Reforms ·₦1.079tn disbursed to ~4.57m farmers (CBN, Feb 2023) Anchor Borrowers' Programme (rice + agro lending) CBN programme launched by President Buhari on 17 November 2015 that lent inputs and cash to smallholder farmers through anchor companies for rice, maize, wheat and other commodities. The CBN said in March 2023 it had released ₦1.079tn to about 4.57m farmers; it put repayment at 52%, while the IMF estimated 24%. Completed · Dec 2023 — The CBN stopped accepting new applications under its development-finance intervention programmes in December 2023 and told banks to recover outstanding loans; a 2025 Auditor-General report said ₦629bn of ABP loans had not been recovered. Completed 2023 Roads & Bridges ·₦336bn ·↳ began under Jonathan Second Niger Bridge (1.6 km bridge + 10.3 km highway) 1.6 km bridge across the River Niger linking Asaba (Delta) and Onitsha (Anambra), with a 10.3 km highway, Owerri interchange and toll station, built by Julius Berger and funded through the Presidential Infrastructure Development Fund (PIDF). It was commissioned by President Buhari on 23 May 2023 and later named after him; Julius Berger formally handed it over to the federal government in December 2023, with some ancillary roads still outstanding. Completed · May 2023 — Commissioned by President Buhari on 23 May 2023; formally handed over by Julius Berger in December 2023, with ancillary access roads continuing under Tinubu. Completed 2023 Power & Energy ·↳ began under Obasanjo Dadin Kowa 40MW Hydropower Plant A 40MW hydropower plant (two 20MW turbine-generators) at the federal Dadin Kowa Dam, Yamaltu-Deba LGA, Gombe State. Nigeria's Mabon Ltd built it with PowerChina under a 25-year build-operate-transfer concession from the Federal Government. It was formally inaugurated in May 2023 after decades of delays. Completed · May 2023 — Water Resources Minister Suleiman Adamu inaugurated the 40MW plant for the Federal Government in May 2023; it was already feeding the national grid. Completed 2023 Roads & Bridges ·Over ₦9 billion (reported) New Ikom Bridge (Cross River) A new dual-carriageway bridge over the Cross River at Ikom, replacing the old Ikom bridge on a major south-north highway. It was funded through the Federal Government's Sukuk road programme. Completed · May 2023 — President Buhari inaugurated the bridge virtually in May 2023. Completed 2023 Power & Energy Kashimbila Multipurpose Dam & 40MW Hydropower Station Federal multipurpose dam on the Katsina-Ala River at Kashimbila, Taraba State, with a 40MW hydropower station and a reservoir of about 500 million cubic metres. Phase I, commissioned in May 2023, covered the power station, a 132kV switchyard, about 245km of 132kV double-circuit lines and substations at Takum, Wukari, Rafin Kada and Donga, plus rehabilitation at Yandev. The water supply and 2,000-hectare irrigation parts were still unfinished at commissioning. Completed · May 2023 — President Buhari commissioned the 40MW hydropower station and its power evacuation network (Phase I) in Taraba on 18 May 2023. Completed 2022 Telecom & Digital ·$273.6m per licence ($547m total) 5G spectrum auction (2021) The NCC auctioned 3.5 GHz 5G spectrum on 13 December 2021; MTN and Mafab Communications each paid $273.6m for a licence by February 2022. MTN began 5G service on 24 August 2022, and Airtel acquired 5G spectrum in January 2023. Completed · Aug 2022 — MTN began 5G service in August 2022. Completed 2022 Aviation & Ports ·↳ began under Jonathan Murtala Muhammed International Airport, Lagos — new international terminal New international terminal at Lagos's Murtala Muhammed International Airport, financed under a China Exim Bank loan approved in 2012 for new terminals at Nigeria's main airports. Commissioned by President Buhari on 22 March 2022, it can process 14 million passengers a year. Completed · Mar 2022 — Commissioned on 22 March 2022. Completed 2021 Major Reforms eNaira — Central Bank Digital Currency The CBN's central bank digital currency, launched by President Buhari on 25 October 2021 as the first CBDC in Africa. Uptake has remained low, with fewer than 0.5% of Nigerians using it a year after launch. Completed · Oct 2021 — Launched 25 October 2021; adoption has remained low. Completed 2021 Rail ·$1.53bn ·↳ began under Jonathan Lagos–Ibadan Standard Gauge Railway commissioning 156 km double-track standard-gauge railway from Lagos (Ebute Metta) to Ibadan, with a spur into Apapa port, built by CCECC. Ground-breaking took place in March 2017, trial operations began in December 2020, and President Buhari commissioned the line on 10 June 2021. Completed · Jun 2021 — In commercial service since its commissioning on 10 June 2021. Completed 2021 Major Reforms Petroleum Industry Act (PIA) 2021 Signed by President Buhari on 16 August 2021 after petroleum reform bills had stalled in the National Assembly for about two decades. It converted NNPC into the commercial NNPC Limited and created the NUPRC and NMDPRA regulators, requires firms to fund host-community trusts with 3% of prior-year operating expenditure, and allocates 30% of NNPC's profit oil and gas to frontier exploration. Completed · Aug 2021 — Enacted 16 August 2021; NNPC Limited was unveiled in July 2022. Completed 2021 Roads & Bridges ·₦6.6 billion (Phases 1 & 2) Vandeikya–Obudu Cattle Ranch Road (Phases 1 & 2) A 24 km federal road linking Vandeikya in Benue State to Obudu in Cross River State, built in two phases. It connects seven Benue communities to Cross River and the Obudu Cattle Ranch area. Completed · Nov 2021 — Inaugurated on behalf of President Buhari by Minister George Akume in November 2021. Completed 2020 Major Reforms African Continental Free Trade Area (AfCFTA) ratification Nigeria signed the AfCFTA agreement in July 2019 and ratified it on 3 December 2020, depositing its instrument on 5 December 2020 ahead of the start of trading on 1 January 2021. Members commit to liberalise tariffs on 90% of goods over time. Completed · Dec 2020 — Ratification instrument deposited 5 December 2020. Completed 2020 Aviation & Ports ·₦10bn Akanu Ibiam International Airport, Enugu — runway reconstruction (2019–2020 closure) Enugu's Akanu Ibiam International Airport was closed in August 2019 for reconstruction of its dilapidated runway, after President Buhari approved ₦10bn for the work. The project also covered taxiways, an instrument landing system, airfield lighting, perimeter fencing and terminal rehabilitation, and the airport reopened to domestic flights on 30 August 2020. Completed · Aug 2020 — Reopened by Aviation Minister Hadi Sirika on 30 August 2020, with international flights planned from 5 September 2020. Completed 2020 Major Reforms Economic Recovery & Growth Plan (ERGP) 2017–2020 Medium-term economic plan launched by President Buhari on 5 April 2017 to pull Nigeria out of the 2016 recession, focusing on agriculture and food security, energy, industrialisation and social investment and aiming for 7% GDP growth by 2020. It was followed by the Medium-Term National Development Plan 2021–2025, approved by the Federal Executive Council in November 2021. Completed · Dec 2020 — The plan period ended in 2020 and was succeeded by the 2021–2025 National Development Plan. Completed 2020 Roads & Bridges ·₦60.96bn after Nov 2020 variation (from ₦51.62bn) ·↳ began under Jonathan Loko–Oweto Bridge Bridge across the River Benue linking Loko (Nasarawa) and Oweto (Benue), awarded in 2011 in three sections. The federal government said in November 2020 that the bridge was essentially finished and open to traffic, with connecting roads still under way, and it was among the projects listed for virtual commissioning by President Buhari on 23 May 2023. Completed · 2020 — Open to traffic since 2020; listed among seven projects President Buhari was to commission virtually on 23 May 2023. Completed 2020 Water & Dams ·FG ₦12.5bn + Katsina about ₦3bn committed (2017 MoU) Zobe Regional Water Supply Scheme Phase 1A (Katsina) A water supply project drawing on Zobe Dam (completed 1983) in Katsina State. It was first awarded in 1992 and abandoned, then revived in 2017 under a federal–Katsina State MoU in which the federal government committed ₦12.5bn and the state about ₦3bn and Phase 1B. Phase 1A, linking the Zobe treatment plant to Dutsin-Ma and Katsina city, was commissioned in May 2020 and handed to the state. Completed · May 2020 — Phase 1A was commissioned in May 2020 and handed to the Katsina State Ministry of Water Resources; by April 2021 it supplied about 40 million litres a day to Katsina city and 5 million to Dutsin-Ma. Completed 2020 Rail Warri–Itakpe Standard Gauge Railway commissioning Standard-gauge line linking the Itakpe iron-ore area and Ajaokuta steel complex to Warri (about 326 km), begun in 1987 and left unfinished for decades. Completed by CCECC and commissioned virtually by President Buhari on 29 September 2020, with passenger services beginning in October 2020. Completed · Sep 2020 — Commissioned 29 September 2020; passenger service began October 2020. Completed 2020 Oil & Gas Escravos–Lagos Pipeline System II (ELPS II) A 342 km, 36-inch gas pipeline built by NNPC alongside the original 1989 Escravos–Lagos Pipeline, through Delta, Edo, Ondo, Ogun and Lagos. It doubles system capacity from about 1.1 to 2.2 bscf/d for power plants and industry in the South-West. Completed · Oct 2020 — NNPC GMD Mele Kyari announced the pipeline complete in October 2020, with contractor Zakhem Construction Nigeria Ltd handing it over to NNPC. Completed 2019 Roads & Bridges ·₦5.8bn (Daily Trust); other reports cite ₦3.56bn ·↳ began under Jonathan Baro Inland River Port (Niger State) NIWA river port on the River Niger at Baro, Agaie LGA, Niger State, awarded to China's CGCC in 2011/12 and commissioned by President Buhari in January 2019. It has a 150 m quay, a 7,000 m² stacking yard, a 3,600 m² transit shed and cargo-handling equipment, but it has not begun operations because the river channel is silted and the access roads have collapsed. Stalled · Aug 2025 — In August 2025 a House of Representatives committee said the port was still idle six years after commissioning; Daily Trust reported that no cargo had been lifted and no vessel had berthed. Stalled 2018 Power & Energy ·About US$900m (privately financed, World Bank IBRD guarantee and MIGA cover) Azura-Edo 461MW Independent Power Plant (private) A PRIVATE, privately financed 461MW open-cycle gas turbine plant near Benin City, Edo State. It was the first large privately financed independent power plant built in Nigeria after the power-sector reform, and a World Bank partial risk guarantee backed it. Construction ran from January 2016, and Phase 1 began commercial operation in May 2018, ahead of schedule. Completed · May 2018 — Phase 1 (461MW) began commercial operation in May 2018 ahead of schedule; Vice President Osinbajo toured the plant on 15 June 2018. Completed 2018 Roads & Bridges ·₦14.579bn contract sum (awarded 2013) ·↳ began under Jonathan Ilorin–Jebba–Mokwa Road Rehabilitation Federal rehabilitation of the Ilorin–Jebba–Mokwa road in Kwara and Niger states, part of the Lagos–Algiers Trans-Sahara route. The 93.6 km Ilorin–Jebba section was rebuilt as a single carriageway, and 38 failed portions of the Jebba–Mokwa section were repaired, along with the rebuilt Tatabu bridge. Awarded in 2013, the work was 15.9% complete when the Buhari administration took office and was declared 100% complete in August 2018. Completed · Aug 2018 — On 17 August 2018 the Information Minister inspected the road and declared the rehabilitation 100% complete. Completed 2018 Aviation & Ports ·↳ began under Jonathan Nnamdi Azikiwe International Airport, Abuja — new international terminal New international terminal at Abuja's Nnamdi Azikiwe International Airport, built under a China Exim Bank-financed programme of new terminals at Nigeria's main airports. Commissioned by President Buhari on 20 December 2018, it is designed to handle up to 15 million passengers a year. Completed · Dec 2018 — Commissioned by President Buhari on 20 December 2018. Completed 2018 Aviation & Ports ·↳ began under Jonathan Port Harcourt International Airport — new international terminal New international terminal at Port Harcourt International Airport, Omagwa, built under the China Exim Bank-financed programme of new terminals at Nigeria's main airports. Commissioned by President Buhari on 25 October 2018. Completed · Oct 2018 — Commissioned by President Buhari on 25 October 2018. Completed 2018 Rail ·About $824m total investment; FCTA financed about 60% via China Exim Bank loans ·↳ began under Obasanjo Abuja Light Rail (Abuja Metro) Phase 1 – Lots 1A and 3 First phase of the Abuja Rail Mass Transit, built by CCECC for the Federal Capital Territory Administration with China Exim Bank loans. Lots 1A and 3 (about 45 km, 12 stations) link the Abuja Metro Station in the Central Business District to Nnamdi Azikiwe International Airport. President Buhari commissioned it on 12 July 2018 as West Africa's first light rail network. Completed · Jul 2018 — President Buhari commissioned Lots 1A and 3 of the Abuja Light Rail at the World Trade Centre, Abuja, on 12 July 2018. Completed 2017 Aviation & Ports ·₦5.8bn Nnamdi Azikiwe International Airport, Abuja — runway reconstruction (2017 closure) Abuja's Nnamdi Azikiwe International Airport was closed from 8 March 2017 for about six weeks while Julius Berger reconstructed its runway, with flights diverted to Kaduna. The airport reopened on 18 April 2017, ahead of schedule. Completed · Apr 2017 — Airport reopened to traffic on 18 April 2017. Completed 2016 Major Reforms ·₦800bn+ recovered since 2016 (Finance Ministry, Feb 2026) Whistleblower Policy 2016 Federal Ministry of Finance policy launched in December 2016 that lets people confidentially report looted or concealed public funds and rewards whistleblowers with 2.5–5% of amounts recovered. It still operates as an executive policy without a dedicated whistleblower-protection law. Completed · Feb 2026 — Policy in force since December 2016; in February 2026 the Minister of State for Finance said over ₦800bn had been recovered through it. Completed 2016 Major Reforms ·₦2tn+ deposits remitted; 17,000+ MDA bank accounts consolidated ·↳ began under Jonathan Treasury Single Account (TSA) full implementation Building on a scheme proposed in 2012 under President Jonathan, the Buhari administration in 2015 directed all federal MDAs to move their revenues into a Treasury Single Account at the CBN. Commercial banks remitted over ₦2tn of government deposits as the policy was fully implemented in 2016, and the Presidency reported that more than 17,000 bank accounts were consolidated. Completed · 2016 — Fully implemented across federal MDAs by 2016 and remains in force. Completed 2016 Rail ·$876m ($500m China Exim Bank loan; balance FGN) ·↳ began under Jonathan Abuja–Kaduna Standard Gauge Railway commissioning 186 km standard-gauge line from Idu (Abuja) to Rigasa (Kaduna), built by CCECC with a $500m China Exim Bank loan and federal funds. Commissioned by President Buhari on 26 July 2016 as Nigeria's first operational standard-gauge passenger service. Services were suspended after the March 2022 train attack and later resumed. Completed · Jul 2016 — In commercial service since its commissioning on 26 July 2016. Completed 2021 Oil & Gas ·$1.5bn Port Harcourt (Mar 2021) + ~$1.5bn Warri and Kaduna combined (Aug 2021) Port Harcourt, Warri and Kaduna refinery rehabilitation contracts The Federal Executive Council approved $1.5bn in March 2021 for the rehabilitation of the Port Harcourt refinery by Italy's Maire Tecnimont, and in August 2021 approved about $1.5bn combined for the Warri and Kaduna refineries. Port Harcourt's older plant restarted in November 2024, but by February 2026 NNPC had shut the state refineries after assessments showed heavy losses. Stalled · Aug 2026 — All three refineries were shut by February 2026; on 30 April 2026 NNPC signed a non-binding MoU with China's Sanjiang Chemical and Xinganchen (Fuzhou) Industrial Park to complete rehabilitation and run the Warri and Port Harcourt plants, and in August 2026 President Tinubu promised a restart without a timeline. Stalled 2021 Rail ·$1.96bn (approved 2020) Kano–Maradi (Nigeria–Niger) Standard Gauge Railway — 2021 ground-breaking Standard-gauge line from Kano through Daura and Katsina to Maradi in Niger Republic, with a branch to Dutse, approved in 2020, awarded to Mota-Engil and ground-broken by President Buhari in 2021; 85% is loan-financed and 15% federally funded. The Kano–Katsina section was reported over 75% complete in August 2026, with Katsina–Maradi targeted for end-2027. Under construction · Aug 2026 — The State House put overall progress at 60% in May 2026; in August 2026 the ministry said the Kano–Katsina section was over 75% complete and due for commissioning in December 2026. Under construction · 60% 2021 Rail ·$3.02bn Port Harcourt–Maiduguri Eastern Narrow Gauge Railway contract ($3.02bn) Contract awarded to CCECC for reconstructing the 1,443 km Port Harcourt–Aba–Enugu–Makurdi–Lafia–Kafanchan–Maiduguri narrow-gauge line, flagged off by President Buhari in March 2021, with 85% loan financing. The 62 km Port Harcourt–Aba section was handed over and reopened in 2024, but work beyond Aba was reported suspended in July 2025. Partly open · Jul 2025 — Milestone entry (2021 award); the Port Harcourt–Aba section has run since May 2024, while the NRC said in July 2025 that work from Aba through Umuahia to Enugu was suspended. Partly open 2020 Oil & Gas ·$2.8bn (85% Chinese-backed financing; 15% NNPC/NGC equity) Ajaokuta–Kaduna–Kano (AKK) Gas Pipeline (614 km) — 2020 construction start 614 km, 40-inch gas pipeline from Ajaokuta (Kogi) through Abuja and Kaduna to Kano, flagged off under President Buhari in 2020 with 85% Chinese-backed financing and 15% equity from NNPC's Nigerian Gas Company. NNPC completed the main line, including the River Niger crossing, in December 2025, but first gas had not been delivered by October 2026. Under construction · Jul 2026 — In July 2026 NNPC said the pipeline was 98% complete with work focused on above-ground off-take facilities and was considering September 2026 for commissioning; the July 2026 first-gas target was missed and October 2026 reports cited further delays. Under construction 2019 Power & Energy Presidential Power Initiative (Siemens) — 2019 agreement Government-to-government grid programme agreed by President Buhari with Germany and Siemens in 2019, initially targeting 7,000 MW of reliable supply by 2021 and 11,000 MW by 2023. Equipment for the pilot phase was ordered in December 2021 and first arrived in September 2022; it delivered 10 mobile 132/33 kV substations and 10 power transformers (3 x 75/100 MVA, 7 x 60/66 MVA), adding 984 MW of transmission capacity. Five Phase One substations (Abeokuta, Offa, Ayede-Ibadan, Sokoto, Onitsha) are under construction. Under construction · Nov 2025 — In November 2025 the government said two of the five Phase One Batch One substations were targeted for completion by end-2026. Under construction 2019 Major Reforms Finance Acts (2019, 2020, 2021, 2022) Annual Finance Acts signed by President Buhari for each year from 2019 to 2022 amended tax laws alongside the federal budget; the first, signed on 13 January 2020, raised VAT from 5% to 7.5% and exempted small companies from company income tax. Later Acts added measures including taxes on digital services. Completed · Jun 2025 — The Acts' provisions were overtaken by the tax reform laws President Tinubu signed in June 2025, which took effect on 1 January 2026. Completed 2017 Roads & Bridges ·₦742.56bn raised from five Sukuk issues, 2017–2022 Sukuk-funded road network The Debt Management Office issued five FGN Roads Sukuk series between 2017 and 2022, raising ₦742.56bn for the construction and rehabilitation of federal roads and bridges across the six geopolitical zones and the FCT. Proceeds of the 2017–2021 issues funded sections of 71 road projects covering 2,808 km and four bridges under the Works Ministry, plus FCT roads. Partly open · Mar 2025 — In March 2025 the DMO said Sukuk issuance since 2017 had reached ₦1.09tn (including later issues under Tinubu), funding over 4,100 km of roads and nine bridges constructed or rehabilitated; several funded roads remain under construction. Partly open 2017 Roads & Bridges ·₦740.79bn after Sep 2024 downward review Abuja–Kaduna–Zaria–Kano Dual Carriageway reconstruction (375 km) — 2017 award Reconstruction of the 375 km dual carriageway from Abuja through Kaduna and Zaria to Kano, awarded to Julius Berger in late 2017 under President Buhari and later backed by the PIDF. The Kaduna–Zaria section (73.4 km) was completed and the Zaria–Kano section (137 km) was completed under President Tinubu, while the Abuja–Kaduna section (165 km) was re-awarded for reconstruction after Julius Berger's contract was revoked in October 2024. Partly open · Oct 2026 — On 22 October 2026 President Tinubu commissioned Section III (Zaria–Kano); the Abuja–Kaduna section remained under construction, with the Works Minister targeting November 2026 for the last 164 km. Partly open 2016 Major Reforms National Social Investment Programmes (NSIP) Federal social-protection programmes launched in 2016: N-Power job placements for young graduates, Conditional Cash Transfers to poor households (₦10,000 every two months), the National Home-Grown School Feeding Programme and GEEP micro-loans. They were later run by the National Social Investment Programme Agency under the humanitarian affairs ministry. Completed · Jan 2024 — On 12 January 2024 President Tinubu suspended all four NSIPA programmes for six weeks in the first instance, pending an investigation of the agency. Completed 2013 Roads & Bridges ·₦213bn total project value (Works Ministry, Feb 2025) ·↳ began under Jonathan Lagos–Ibadan Expressway reconstruction (127.6 km) Reconstruction of the 127.6 km Lagos–Shagamu–Ibadan expressway, begun in 2013 and largely built under President Buhari in two sections (Lagos–Shagamu by Julius Berger; Shagamu–Ibadan by RCC), part-financed through the PIDF. A planned commissioning by Buhari in May 2023 was called off because a stretch near Lagos was unfinished, and an 8.55 km Lagos-bound stretch was still outstanding in February 2025. Partly open · Jun 2026 — In June 2026 the Works Minister said a Julius Berger-built Ibadan-bound section was failing and President Tinubu ordered its reconstruction in reinforced concrete; FEC also approved an operation-and-maintenance concession to Aspect Concession Ltd. Partly open 2013 Aviation & Ports ·↳ began under Jonathan Mallam Aminu Kano International Airport, Kano — new international terminal New international terminal at Kano's Mallam Aminu Kano International Airport, one of the new terminals built at Nigeria's main airports under a China Exim Bank-financed programme. The Presidency listed it among completed terminals, and international flights were operating from the new terminal when services resumed after the COVID-19 suspension on 6 April 2021. Completed · Apr 2021 — In use for international flights by 6 April 2021; no formal commissioning date was found. Completed 2026 Roads & Bridges ·$2.594bn, privately financed BOOT PPP, 45-year concession (FEC Aug 2022) Badagry Deep Seaport (PPP) A proposed greenfield deep seaport at Badagry, Lagos State. The Federal Executive Council approved it in August 2022 as a $2.594bn build-own-operate-transfer PPP with a 45-year concession, to be built in four phases. In September 2026 APM Terminals signed an MoU with Badagry Port Development Limited for exclusive negotiations. Approved · Sep 2026 — On 7 September 2026 APM Terminals and Badagry Port Development Ltd signed an MoU in Copenhagen for exclusive negotiations on developing the port; it is not a final investment or construction agreement. Approved 2026 Roads & Bridges ·$461,924,369, PPP at no cost to FG (FEC Oct 2020) Bonny Deep Seaport (PPP) A proposed deep seaport at Bonny, Rivers State. The Federal Executive Council approved it in October 2020 as a PPP at no cost to the federal government, alongside the Port Harcourt–Maiduguri railway with a Port Harcourt–Bonny branch line. In September 2026 the government again listed it among six new deep seaports approved for development. Approved · Sep 2026 — On 27 September 2026 the Marine and Blue Economy Minister listed Bonny among six deep seaports with federal approval for development; no construction has been reported. Approved 2020 Rail ·$5.3bn (Ibadan–Kano, FEC Sept 2019); $318m FG counterpart funding approved Jun 2020 Ibadan–Ilorin–Minna–Kaduna standard gauge railway (Lagos–Kano SGR middle segment) Proposed middle section of the Lagos–Kano standard gauge railway from Ibadan through Osun, Kwara and Niger states to Kaduna. The Federal Executive Council approved the $5.3bn Ibadan–Kano project in September 2019, and in June 2020 President Buhari approved $318m in counterpart funding, with CCECC as contractor and China Exim Bank financing under negotiation. The Kaduna–Kano section is a separate entry. Approved · Jun 2020 — In June 2020 President Buhari approved $318m (about ₦123bn) in counterpart funding for the Ibadan–Kano SGR. The minister said work would start by the end of August 2020. Approved 2020 Rail ·About $3bn including a Warri seaport (Transport Minister Amaechi, Apr 2019) Itakpe–Abuja rail extension and Warri new seaport link Planned extension of the Warri–Itakpe standard gauge line northward from Itakpe to Abuja, plus a southern link from Ujevwu to a new seaport at Warri. When he inaugurated the Warri–Itakpe line in September 2020, President Buhari said his government had approved linking it to Abuja and directed that the ports, including Warri, be connected by rail. Approved · Sep 2020 — On 29 September 2020 President Buhari said the government had approved extending the line from Itakpe to Abuja and linking it south to the Warri ports. Approved 2021 Rail ·$11.174bn (FEC ratification, Aug 2021) ·↳ began under Jonathan Lagos–Calabar coastal railway Planned standard gauge railway linking Nigeria's coastal cities from Lagos through Ore, Benin City, Warri, Yenagoa, Port Harcourt, Aba, Uyo and Calabar, continuing to Ikom and Obudu, with branches to Onitsha and Onne. It is separate from the Lagos–Calabar coastal highway. In August 2021 the Federal Executive Council approved the $11.174bn project for construction over six years, describing it as an inherited project. Contract awarded · Aug 2021 — On 4 August 2021 the FEC ratified the award of the $11.174bn Lagos–Calabar coastal rail contract, with a six-year completion period. Contract awarded
Bola Ahmed Tinubu
Bola Ahmed Tinubu
2023 – now · APC · 54 projects
Full tenure
2026 Aviation & Ports Akanu Ibiam International Airport, Enugu – PPP concession to Aero Alliance PPP concession of Enugu's Akanu Ibiam International Airport to Aero Alliance Limited, which will finance, rehabilitate, expand, operate and manage the airport. The Federal Executive Council approved the concession on 31 July 2025, the agreement was signed in January 2026, and the airport was formally handed over in June 2026. Completed · Jun 2026 — On 25 June 2026 the Aviation Minister formally handed the airport to Aero Alliance Ltd, completing the concession transfer; the concessionaire's rehabilitation and expansion works lie ahead. Completed 2026 Major Reforms ·₦4.65tn new capital raised by 33 banks Bank Recapitalisation 2024–2026 A CBN circular in March 2024 raised minimum bank capital to ₦500bn (international), ₦200bn (national) and ₦50bn (regional), with a 31 March 2026 deadline. On 1 April 2026 the CBN said 33 banks had met the new thresholds after raising ₦4.65tn, 72.55% of it from domestic investors. A limited number of banks remain under regulatory or judicial processes; Nairametrics named Unity Bank (merging with Providus) and Union Bank (whose acquisition is under judicial review). Completed · Apr 2026 — The CBN concluded the exercise on 1 Apr 2026, with 33 banks compliant and ₦4.65tn raised. Completed 2026 Major Reforms National Single Window (trade portal) A single digital portal for import and export permits, licences, certificates and electronic cargo manifests. It links Customs, the NPA, NAFDAC, SON, NIMASA, the CBN, the NRS and other agencies. President Tinubu launched the project in 2024, and the platform went live on 27 March 2026. Completed · Mar 2026 — The National Single Window went live on 27 Mar 2026, and officials declared full-scale operations from its Apapa operations centre. Completed 2026 Power & Energy Ihovbor/Benin and Ihovbor/Ajaokuta 330kV Turn-In-Turn-Out Lines (TCN) A TCN project linking the existing Benin–Ajaokuta 330kV line to the Ihovbor transmission substation in Edo State through about 14 km of new 330kV double-circuit line on 30 towers, built by Energo Nigeria. TCN says it allows about 600 MW of extra power from the Azura and NDPHC Ihovbor plants to be evacuated. Completed · May 2026 — The project was completed on 23 April 2026 and formally commissioned by TCN at Ihovbor substation on 14 May 2026. Completed 2026 Aviation & Ports ·₦46bn approved for second-runway rebuild Kano (MAKIA) domestic terminal remodelling The aviation minister, Festus Keyamo, inaugurated the remodelled Muhammadu Adamu Dankabo Domestic Terminal at Mallam Aminu Kano International Airport in late July 2026. The FG also approved ₦46bn to resurface and rebuild the airport's second runway. Completed · Jul 2026 — The remodelled domestic terminal was inaugurated on 28 Jul 2026; the ₦46bn second-runway rebuild is approved but not yet reported as started. Completed 2026 Power & Energy ·Apapa Road and Ijora works funded by JICA and the World Bank Lagos Transmission Substation Upgrades – Apapa Road, Ijora, Alausa, Lekki (TCN) Upgrades at four TCN transmission substations in Lagos: Apapa Road, Ijora, Alausa and Lekki. Eight new power transformers (840 MVA in total) and a new gas-insulated substation at Apapa Road add about 672 MW of transmission capacity to the Lagos grid; TCN said the Apapa Road and Ijora works were sponsored by JICA and the World Bank respectively. Completed · Aug 2026 — The Minister of Power commissioned the upgrades on 17–18 August 2026, including the doubling of Lekki's 330/132kV capacity to 600 MVA and nine new 33kV feeders. Completed 2025 Major Reforms ·Minimum capital ₦10bn (life), ₦15bn (non-life), ₦35bn (reinsurance) Nigerian Insurance Industry Reform Act (NIIRA) 2025 President Tinubu signed the Nigerian Insurance Industry Reform Act on 31 July 2025, repealing the Insurance Act and four other insurance laws. It set minimum capital at ₦10bn for life insurers, ₦15bn for non-life and ₦35bn for reinsurers, with 12 months for existing firms to comply. After the 31 July 2026 deadline NAICOM confirmed that 43 firms (41 insurers and 2 reinsurers) had met the requirements, with eight more under final verification. Completed · Aug 2026 — On 3 Aug 2026 NAICOM published the list of 43 insurers and reinsurers that met the 31 Jul 2026 recapitalisation deadline. Completed 2025 Major Reforms Investments and Securities Act (ISA) 2025 Signed on 29 March 2025, the Act repealed the Investments and Securities Act 2007. It classifies virtual and digital assets as securities under SEC oversight, strengthens SEC powers and the Investments and Securities Tribunal, and creates frameworks for commodity exchanges and warehouse receipts. Completed · Mar 2025 — Signed into law on 29 Mar 2025. Completed 2025 Major Reforms Tax Reform Acts 2025 (Nigeria Tax Act, Tax Administration Act, NRS Act, JRB Act) On 26 June 2025 President Tinubu signed four tax laws: the Nigeria Tax Act, Nigeria Tax Administration Act, Nigeria Revenue Service (Establishment) Act and Joint Revenue Board (Establishment) Act. They consolidate fragmented tax laws, create a tax ombudsman and rename the FIRS as the Nigeria Revenue Service. The main acts took effect on 1 January 2026. Completed · Jan 2026 — The new tax laws took effect on 1 Jan 2026, when the FIRS formally became the Nigeria Revenue Service. Completed 2025 Aviation & Ports Bilateral Air Services Agreements (2023–2025) Since 2023 the aviation ministry has signed or amended several Bilateral Air Services Agreements. These include Kuwait (approved by the FEC on 7 September 2023 and signed in Saudi Arabia after COP28 in December 2023) and an amended UAE agreement, signed in Abu Dhabi on 12 February 2025, that widened codesharing and interlining. Completed · Feb 2025 — Nigeria and the UAE amended their BASA on 12 Feb 2025 to expand codeshare arrangements. Completed 2024 Major Reforms ·₦70,000/month National Minimum Wage — ₦70,000/month President Tinubu signed the National Minimum Wage (Amendment) Act 2024 on 29 July 2024, after negotiations with the NLC and TUC. It raised the national minimum wage from ₦30,000 to ₦70,000 a month and cut the review cycle from five years to three. Completed · Jul 2024 — Signed into law at the FEC on 29 Jul 2024. Completed 2024 Education & Social ·₦372.62bn disbursed (to 29 Sep 2026) Student Loan (Access to Higher Education) Act and NELFUND President Tinubu signed the Student Loan Act in June 2023, and on 3 April 2024 signed the Student Loan (Access to Higher Education) Act 2024, which repealed it and dropped the family-income threshold and guarantor requirements. The Act set up the Nigerian Education Loan Fund (NELFUND), which lends for tuition and upkeep to students of approved tertiary and vocational institutions; its portal opened in May 2024. By 29 September 2026 NELFUND reported ₦372.62bn disbursed: ₦192.89bn in fees to 319 institutions and ₦179.73bn in upkeep to students. Completed · Oct 2026 — NELFUND's disbursement report of 3 Oct 2026 put cumulative loans at ₦372.62bn, with 1.66m applications processed. Completed 2024 Rail ·₦21.4bn station access roads; $30m arrears paid to CCECC ·↳ began under Buhari Abuja Rail Mass Transit (light rail) restart The Abuja light rail was first commissioned in 2018 but fell idle and was vandalised after COVID-19. President Tinubu relaunched commercial operations on Lots 1 and 2 on 29 May 2024, after the FG spent ₦21.4bn on station access roads and the CBN helped pay $30m owed to contractor CCECC. Rides were free until the end of 2024. Completed · May 2024 — Commercial operations were relaunched on 29 May 2024, with free rides extended to the end of 2024. Completed 2024 Rail ·↳ began under Buhari Port Harcourt–Aba narrow-gauge rail service The rehabilitated 62 km Port Harcourt–Aba section of the Eastern (Port Harcourt–Maiduguri) narrow-gauge line was inaugurated by Transport Minister Said Alkali on 30 April 2024, with free rides from 1 to 4 May and commercial operations from 7 May 2024. It is the first section of the 1,443 km Eastern line rehabilitation by CCECC, awarded under the previous administration, to return to service. Completed · Apr 2024 — Inaugurated on 30 Apr 2024, with free rides on 1–4 May and commercial operations from 7 May 2024. Completed 2024 Roads & Bridges ·↳ began under Buhari Third Mainland Bridge Rehabilitation Federal rehabilitation of the 11.8km Third Mainland Bridge in Lagos. A first phase (July 2020 – February 2021) replaced expansion joints and bearings and resurfaced the deck under partial closures. Further work replaced all expansion joints and removed accumulated surface layers that had added dead load to the bridge. Completed · May 2024 — President Tinubu virtually inaugurated the rehabilitated bridge in May 2024, after the first phase had fully reopened it to traffic on 27 February 2021. Completed 2024 Roads & Bridges ·Funded via tax credit (Dangote) ·↳ began under Buhari Apapa–Oshodi–Oworonshoki–Ojota Expressway Reconstruction Reconstruction of the 36.02km federal expressway linking Apapa and Tin Can Island ports to Oworonshoki and Ojota in Lagos, using continuously reinforced concrete pavement. Built by Dangote Industries (with Hitech as subcontractor) under the road infrastructure tax credit scheme, it was flagged off in 2018 and inaugurated in May 2024. Completed · May 2024 — On 26 May 2024 President Tinubu, represented by Senate President Akpabio, inaugurated the reconstructed expressway at Gbagada. Completed 2024 Water & Dams ·Part of the US$495.3m World Bank TRIMING credit covering four schemes ·↳ began under Jonathan Bakolori Irrigation Scheme Rehabilitation (TRIMING) Rehabilitation of the federal Bakolori Irrigation Scheme in Zamfara State under the World Bank-financed Transforming Irrigation Management in Nigeria (TRIMING) project. TRIMING also rehabilitated the Kano River, Hadejia Valley and Dadin Kowa schemes. Because of insecurity, Bakolori's scope was cut from 13,000 ha to 7,258 ha. Completed · Dec 2024 — The World Bank reported that physical completion of Bakolori's reduced 7,258 ha scope was reached by 15 December 2024, and the TRIMING closing date was extended to 30 June 2025. Completed 2024 Power & Energy ·$1.3bn build cost; concession $70m/yr for 30 years ·↳ began under Jonathan Zungeru Hydropower (700 MW) — concession and handover The 700 MW Zungeru hydropower plant on the Kaduna River in Niger State was built with a $1.3bn project funded partly by China Exim Bank. It was declared complete in May 2023 under the previous administration. Under President Tinubu, the BPE signed a 30-year, $70m-a-year concession with Penstock Limited on 13 December 2023 and handed the plant over on 23 January 2024. Completed · Jan 2024 — The plant was handed over to concessionaire Penstock Ltd on 23 Jan 2024, after the concession was signed on 13 Dec 2023. Completed 2024 Roads & Bridges ·85% China Exim Bank loan; Mararaba–Keffi CHEC section ₦73.9bn (NNPC tax credit) ·↳ began under Buhari Abuja–Keffi–Akwanga–Lafia–Makurdi Road Expansion and Dualisation Federal expansion of Abuja–Keffi and dualisation of Keffi–Akwanga–Lafia–Makurdi (225.4km) by China Harbour Engineering Company, funded 85% by a China Exim Bank loan. Completed in 2024 and tolled from February 2025 under a 25-year operate-and-maintain concession. A further Mararaba–Keffi (Section I) expansion is being built by CHEC and JRB. Partly open · Jun 2026 — In June 2026 Umahi said CHEC's 43.65km Mararaba–Keffi contract was 99.8% complete and ready for commissioning, while JRB's section had about 21km of 40km binder course laid. Partly open 2023 Major Reforms Petrol Subsidy Removal President Tinubu declared the end of the petrol subsidy in his inaugural speech on 29 May 2023. On 31 May 2023 NNPC raised pump prices to between ₦488/L and ₦557/L depending on location (₦488 in Lagos, ₦537 in Abuja), citing more than $6bn in outstanding subsidy claims. Completed · May 2023 — NNPC put new pump prices of ₦488–557/L into effect on 31 May 2023, two days after the inaugural announcement. Completed 2023 Major Reforms Naira Floatation (FX Unification) On 14 June 2023 the CBN merged all official foreign-exchange segments into the Investors & Exporters window, letting market forces set the rate. The naira, long pegged at about ₦460/$1, traded as weak as ₦750–755/$1 during the first day before closing at ₦664/$1. Completed · Jun 2023 — The CBN announced the unification of FX windows on 14 Jun 2023, and the naira closed at ₦664.04/$1 that day. Completed 2023 Power & Energy Electricity Act 2023 — state electricity markets Signed in June 2023, the Act lets states legislate for and regulate their own electricity markets. NERC completed the first transfers of regulatory oversight to Enugu and Ekiti on 22 October 2024 and Ondo on 23 October 2024. By February 2026, 15 states had taken over their markets: Enugu, Ekiti, Ondo, Imo, Oyo, Edo, Kogi, Lagos, Ogun, Niger, Plateau, Abia, Anambra, Nasarawa and Bayelsa; Akwa Ibom followed in August 2026. Completed · Aug 2026 — NERC handed regulation of Akwa Ibom's electricity market to its state regulator on 18 Aug 2026; NERC had put the number of transferred states at 16 in July 2026. Completed 2026 Roads & Bridges ·₦111bn approved for Section I (Jul 2026) Akwanga–Jos–Bauchi–Gombe–Maiduguri Superhighway A 700 km, five-section superhighway from Akwanga through Jos, Bauchi, Gombe and Biu to Maiduguri, billed as the administration's fourth legacy highway. Section II (Gombe–Biu) was flagged off on 4 June 2026, and Section I (Akwanga–Jos, 125 km) on 1 July 2026, when the President was represented by APC National Chairman Nentawe Yilwatda and ₦111bn was approved for Section I. Started · Jul 2026 — Section I (Akwanga–Jos, 125 km) was flagged off on 1 Jul 2026 with ₦111bn approved, following the 4 Jun 2026 flag-off of Section II (Gombe–Biu); no progress figures have been published. Started 2026 Roads & Bridges ·£746m UKEF-backed facility via Citibank Apapa and Tin Can Island ports reconstruction The FG secured a £746m buyer-credit facility backed by UK Export Finance and arranged by Citibank. It will rebuild quays and jetties at Lagos Port Complex (Apapa) and Tin Can Island and deepen the draft from about 13 m to at least 16 m. Officials said works would begin in Q2 2026 and take 48 months; no physical start has been confirmed. Approved · Mar 2026 — On 30 Mar 2026 a marine ministry adviser said the financing agreement with Citibank and UK Export Finance had been signed and works should begin the next quarter; no start has been confirmed. Approved 2026 Roads & Bridges ·₦548.98bn (FEC, Apr 2026); ₦5.6bn design consultancy approved Mar 2026 Carter Bridge Demolition and Reconstruction (Lagos) Federal demolition and replacement of the ageing Carter Bridge linking Lagos Island and the mainland, after technical reviews found its underwater piles and pile caps beyond repair. The new 1.93 km bridge, awarded to CCECC after competitive bidding, adds a flyover ramp and two 105 m navigation spans. Under construction · Oct 2026 — The site was handed to CCECC in May 2026. In August 2026 the contractor had mobilised, built access roads and set up its yard, with piling due to start, and the minister targeted completion within 24 months; he inspected the ongoing works again on 1 October 2026. Under construction 2026 Water & Dams ·$500m (World Bank) Sustainable Power and Irrigation for Nigeria (SPIN) project A $500m World Bank-financed project run by the Federal Ministry of Water Resources and Sanitation. It aims to modernise irrigation, improve dam operations and safety, and support hydropower development, building on the earlier TRIMING project. The FG and World Bank inaugurated it on 10 March 2026. Started · Mar 2026 — The FG and World Bank formally inaugurated the project on 10 Mar 2026; no site works had been reported. Started 2025 Roads & Bridges ·₦454bn (Section 1) + ₦685bn (Section 2) contract sums Calabar–Ebonyi–Benue–Nasarawa–Abuja Superhighway A legacy superhighway from Calabar through Ebonyi, Benue, Kogi and Nasarawa towards Abuja. Section 1 (118.85 km at flag-off, now given as 123 km, Calabar to the Ebonyi–Benue boundary) was flagged off at Afikpo on 16 April 2025 by Governor Francis Nwifuru on behalf of President Tinubu. Section 2 (178 km, through Benue, Kogi and Nasarawa to Owete) has commenced, and a second carriageway is being procured. Under construction · May 2026 — At a May 2026 inspection the Works Minister said 50% of the ₦454bn Section 1 contract had been paid and Section 2 had commenced. Under construction 2025 Power & Energy ·Up to ₦4trn authorised; ₦1.23trn issued (Jan & Aug 2026) Power Sector Debt Reduction Programme (₦4trn bonds) In July 2025 President Tinubu backed up to ₦4trn of FG-backed bonds to clear verified debts owed to power generation companies and gas suppliers, accumulated mainly from 2015 to 2023. Issued through NBET, Series 1 (₦501bn, January 2026) and Series 2 (₦728.9bn, August 2026, including ₦326.9bn of non-cash bonds) total ₦1.23trn so far. The first coupon, about ₦63.5bn, was paid on 14 July 2026. Started · Aug 2026 — Series 2 (₦728.9bn, including ₦326.9bn of non-cash bonds) was issued in Aug 2026, bringing the total raised to ₦1.23trn of the ₦4trn authorised. Started 2025 Telecom & Digital ·$2bn total; World Bank $500m, AfDB $200m, EBRD $100m, EU €22m grant Project BRIDGE — 90,000 km national fibre backbone A $2bn open-access programme to lay about 90,000 km of new fibre-optic cable nationwide. Financing comes from the World Bank ($500m, approved October 2025), EBRD ($100m), a €22m EU grant and AfDB ($200m, April 2026), plus private capital. In August 2026 the FG incorporated the delivery company, Bridge Open Access, with the government holding 25–49% and private investors at least 51%; physical rollout has not started. Approved · Aug 2026 — Bridge Open Access was incorporated in Aug 2026 to move the project into execution; no physical deployment had been reported. Approved 2024 Roads & Bridges ·$747m (Sec 1, Jul 2025) + $1.126bn (Sec 2, Dec 2025) financing closed Lagos–Calabar Coastal Highway A planned ~750 km six-lane concrete coastal highway from Lagos to Cross River, renamed the President Bola Ahmed Tinubu Coastal Highway in July 2026. Section 1 (47.47 km, Victoria Island–Eleko) is complete, and the Lagos stretch of Sections 1 and 2 (about 103 km) has been opened to traffic while bridges are still being built; sections in Akwa Ibom and Cross River are also in progress. Partly open · Sep 2026 — On 24 Sep 2026 the Federal Controller of Works threatened to shut the 103 km Lagos section, opened to traffic before its 20 major bridges were finished, over safety breaches and vandalism. Partly open 2024 Roads & Bridges Sokoto–Badagry Superhighway A 1,068 km six-lane greenfield highway planned to run from Sokoto through Kebbi, Niger, Kwara, Oyo and Ogun to Badagry (Lagos), built by Hitech Construction. Works are under way in Sokoto and on Section II in Kebbi (Km 120–378, 258 km), which was inaugurated on 25 October 2024. Under construction · Jan 2026 — At a 21 Jan 2026 inspection the Federal Controller reported 7 km of concrete pavement (Km 170–177) in Kebbi, earthworks advanced to Km 135 and about 25 km of soil stabilisation. Under construction 2024 Oil & Gas Naira-for-Crude Supply to Domestic Refineries Since October 2024 NNPC has sold crude to the Dangote Refinery priced at international benchmarks but paid in naira, to reduce foreign-exchange pressure. The first six-month pilot ended in March 2025 while talks on a new contract continued, and the scheme was still running in 2026. In March 2026 Dangote said it was receiving only about 30% of its required volumes under the arrangement. Completed · Mar 2026 — In Mar 2026 the Dangote Refinery said it was getting about five of the 13–15 cargoes a month it needs under the scheme. Completed 2024 Housing Renewed Hope Cities and Estates (housing programme) A Federal Ministry of Housing and Urban Development programme launched on 8 February 2024 with the 3,112-unit Renewed Hope City at Karsana, Abuja. It also plans cities in Lagos (2,500 units) and Kano (1,500 units) and smaller Renewed Hope Estates in states, delivered partly through public-private partnerships. In January 2026 the ministry said the Abuja, Lagos and Kano cities were due for commissioning soon and that Maiduguri, Enugu and Port Harcourt would be added. Under construction · Jan 2026 — In Jan 2026 the housing ministry said the Karsana, Lagos and Kano Renewed Hope Cities were due for commissioning soon; no formal handover was confirmed. Under construction 2023 Oil & Gas ·Budget: ₦100bn (2023), ₦130bn (2024), ₦225bn (2025); $2bn+ private investment Presidential CNG Initiative (Pi-CNG) A programme launched in 2023, after subsidy removal, to make compressed natural gas a cheaper transport fuel through conversion kits, conversion centres, refuelling stations and CNG buses. By January 2026 Pi-CNG reported more than 100,000 vehicles and 4,600 tricycles running on CNG and 379 conversion centres, and it had deployed 160 CNG buses to transport unions and state mass-transit firms by January 2025. Station rollout lagged the 2025 targets; the goal is 1 million CNG vehicles by 2027. Started · Jan 2026 — In Jan 2026 Pi-CNG said more than 100,000 vehicles were running on CNG, up from about 11,000 in 2023, with 379 conversion centres and 21 mother stations. Started 2023 Major Reforms ·₦7.28tn collected (2025) Customs revenue and modernisation drive (Adeniyi era) Bashir Adewale Adeniyi was appointed acting Comptroller-General of Customs in June 2023. Customs reported ₦6.1tn in revenue in 2024 and ₦7.28tn in 2025, beating the 2025 target of ₦6.58tn. The service credits digital tools, better compliance and enforcement, and Customs is a lead agency on the National Single Window. Started · Jan 2026 — On 27 Jan 2026 the Comptroller-General reported ₦7.28tn collected in 2025, about 19% more than in 2024. Started 2021 Oil & Gas ·$1.5bn rehabilitation (FEC-approved 2021) ·↳ began under Buhari Port Harcourt Refinery rehabilitation and restart After a $1.5bn rehabilitation approved by the FEC in 2021, NNPC announced on 26 November 2024 that the Port Harcourt refinery had resumed production. NNPC shut it on 24 May 2025 for what was billed as 30-day maintenance, and it had not restarted by mid-2026. On 30 April 2026 NNPC signed an MoU with China's Sanjiang Chemical and a Fuzhou industrial-park operator to complete rehabilitation and run the Port Harcourt and Warri refineries. Stalled · Apr 2026 — Shut since 24 May 2025; on 30 Apr 2026 NNPC signed an MoU with Sanjiang Chemical and Xinganchen (Fuzhou) Industrial Park Operation and Management Co. to complete rehabilitation. Stalled 2021 Rail ·↳ began under Buhari Kano–Katsina–Maradi standard-gauge railway A standard-gauge line from Kano via Daura and Katsina to Maradi in Niger Republic, with a branch to Dutse, built by Mota-Engil and begun under the previous administration; the FG provides 15% counterpart funding. In August 2026 the ministry said the Kano–Katsina corridor was more than 75% complete and due for commissioning in December 2026, with the extension to Maradi expected by the end of 2027. Under construction · Aug 2026 — FMINO (27 Aug 2026) put the Kano–Katsina section at over 75% complete and targeted Dec 2026 commissioning; the State House put the overall project at 60% in May 2026. Under construction 2020 Oil & Gas ·About US$5bn per ThisDay (some outlets cite up to US$10bn) ·↳ began under Buhari NLNG Train 7 (Bonny) Seventh liquefaction train at Nigeria LNG's Bonny Island plant, which will raise capacity from 22 to about 30 million tonnes per annum. NLNG is a joint-venture company, not a government agency: NNPC Ltd holds 49%, Shell 25.6%, TotalEnergies 15% and Eni 10.4%. Under construction · May 2026 — In May 2026 Train 7 was reported 92% complete and moving into systems completion and pre-commissioning, with start-up expected in 2027. Under construction · 92% 2015 Roads & Bridges ·₦23bn original contract (2015) ·↳ began under Jonathan Suleja–Minna Road Dualisation and Reconstruction Federal dualisation of the Suleja–Minna road in Niger State was flagged off in February 2015 and awarded to Salini Nigeria with a 48-month completion period. In June 2025 the Works Minister declared sections one and two emergency projects and terminated Salini's contract over failed work. The road was later redesigned as a concrete pavement, and the 7.9 km Maje–Dikko section is being delivered under the NNPC tax-credit scheme. Under construction · Sep 2026 — In September 2026 the Minister of State for Works gave the concessionaire on the Maje–Dikko section 48 hours to finish emergency repairs after a days-long gridlock, while residents complained about the slow pace of work on the dualisation. Under construction 2009 Power & Energy ·Over ₦100bn spent by 2019 (Daily Trust) ·↳ began under Yar'Adua Kaduna (Kudenda) 215MW Power Plant A 215MW federal thermal power plant in Kaduna, built for the Federal Ministry of Power. General Electric and Rockson Engineering won the contract in November 2009. Work stopped around 2018/2019, leaving the plant unfinished for years. The Tinubu administration resumed it, and the 330kV Kudenda–Mando line to evacuate its power was still being built in 2025. Under construction · Apr 2025 — In April 2025 Power Minister Adebayo Adelabu said the plant was 87% complete and would start operating before the end of 2025. Under construction · 87% 2007 Roads & Bridges ·Section III (Azare–Potiskum) ₦45bn Kano–Maiduguri Road Dualisation Federal dualisation and reconstruction of the Kano–Shuwarin–Azare–Potiskum–Damaturu–Maiduguri trunk road, executed in five sections. Sections II and III were inaugurated in December 2021; the Section I (Kano–Shuwarin) contract, awarded in 2007, was terminated in 2024 and re-awarded in 2025. Partly open · Jul 2026 — In July 2026 the Federal Controller of Works in Kano said work had commenced on the re-awarded Section I (Kano–Shuwarin) and remained ongoing. Partly open 2002 Roads & Bridges ·₦74.649bn revised sum (2017, per Federal Controller of Works); about ₦28bn released by Jan 2026 ·↳ began under Obasanjo Kaduna Eastern Bypass (dual carriageway) A new dual-carriageway bypass east of Kaduna metropolis, running from the Kachia road to Mararaban Jos on the Kaduna–Zaria road, with several bridges including the 324 m Chikaji bridge. It was first awarded in 2002, re-approved by the Federal Executive Council in February 2017 and placed under Sukuk funding; Eksiogullari Construction is the contractor. Partly open · Jan 2026 — At a January 2026 inspection the contractor said about 36 km had been built and 24 km opened to traffic, at about 57% physical completion, and appealed for funds to complete the Chikaji bridge. Partly open · 57% 1979 Industry & Steel ·$1.5–2bn estimated revival cost (Jul 2026); no deal signed Ajaokuta Steel Company Revival Efforts to revive the Ajaokuta Steel complex in Kogi State, which has not produced liquid steel since it was established in 1979. In 2026 the Ministry of Steel Development signed a 20-year gas sale and purchase agreement with NNPC, began a technical audit of the plant, and said it was in advanced talks with a Chinese company on a $1.5–2bn revival deal. Stalled · Jul 2026 — In July 2026 the Steel Minister said a revival agreement with a Chinese firm was expected before the end of 2026, after a 20-year gas supply deal with NNPC; the plant still produces no steel. Stalled 2026 Aviation & Ports ·₦92.12bn FEC approval (Mar 2022); contractor sought about ₦532bn; minister now cites nearly ₦400bn ·↳ began under Yar'Adua Nnamdi Azikiwe International Airport, Abuja – Second Runway A second runway at Abuja's Nnamdi Azikiwe International Airport, first awarded to Julius Berger in 2009 at ₦64bn and revoked in 2010. It was re-awarded to CCECC, and the FEC approved ₦92.12bn in March 2022, but the project stalled after the contractor sought a review to about ₦532bn, which the government rejected. President Tinubu approved CCECC's return to site in 2026. Contract awarded · Oct 2026 — In October 2026 the Aviation Minister said the President had approved CCECC's return to start the runway, at a cost now near ₦400bn; no resumption of physical work has been reported. Contract awarded 2026 Roads & Bridges ·₦56bn for one 53 km section (Sep 2025 report) Abuja–Lokoja Highway Reconstruction Federal reconstruction and rehabilitation of the Abuja–Lokoja highway in sections. These include the 47 km Kotonkarfe–Abaji (Abuja-bound) carriageway, Section 4A and the Lokoja–Ganaja road, mostly in concrete pavement. Under construction · Jan 2026 — In January 2026 an inspection found Kotonkarfe–Abaji at 10.21%, Section 4A at 22.40% and Lokoja–Ganaja at 99.73%, despite a 2026 deadline. Under construction 2026 Roads & Bridges ·₦187bn for the remaining 96 km (FEC, May 2025) Benin–Ore–Shagamu Expressway Reconstruction Federal reconstruction of the Shagamu–Ore–Benin dual carriageway, currently on the Shagamu/Iperu Junction–Ajebandele stretch linking Ogun towards Ondo, with CBC as contractor. After an earlier 24km (12km per carriageway) section from the Shagamu Interchange, the Federal Executive Council awarded the remaining 48km per carriageway (96km in total) to CBC for ₦187bn in May 2025. Under construction · Jan 2026 — In January 2026 Works Minister Umahi inspected the 48km Iperu Junction–Ajebandele section of the Benin–Ofosu–Ore–Sagamu dual carriageway and commended the contractor's pace and quality. Under construction 2025 Water & Dams Dasin Hausa Dam (Lagdo buffer dam) Proposed federal multipurpose dam at Dasin, Fufore LGA, Adamawa State, meant to buffer floods from releases at Cameroon's Lagdo Dam. It is planned to produce more than 300 MW and irrigate about 150,000 hectares across Adamawa, Taraba and Benue, and is being pursued as a public-private partnership through the ICRC. Planned · Mar 2025 — In March 2025 the ICRC met the Ministry of Water Resources and a private proponent (Mainstream Energy Solutions) to speed up a PPP for the dam; no award or construction start has been reported. Planned 2026 Roads & Bridges ·About ₦18bn underwater-repair contract + ₦12bn emergency intervention proposed (Jun 2026) Eko Bridge Rehabilitation and Stabilisation (Lagos) Federal repairs to the Eko Bridge in Lagos. The bridge was closed after a March 2022 fire at its Apongbon section and reopened in July 2023 after 15 months of joint federal and Lagos State work. In May 2026 inspections found about eight badly damaged piles, which officials blamed on miners and scavengers, and one carriageway was shut for emergency repairs. Under construction · Jun 2026 — On 22 June 2026 the Works Minister said stabilisation works had begun. He said an existing contract of about ₦18bn covers underwater repairs and a ₦12bn emergency intervention had been sent for approval. Under construction 2026 Roads & Bridges ·Over ₦350bn total reconstruction (ministry figure) ·↳ began under Buhari Enugu–Onitsha Expressway reconstruction A 72 km section of the Enugu–Onitsha Expressway is being rebuilt in reinforced concrete after years of delay under an earlier MTN tax-credit arrangement. Works Minister David Umahi opened the first completed 15 km on 2 April 2026. Other stretches, including an 18 km section towards Anambra and a 39 km section from the Niger Bridge axis, are still under construction. Partly open · Apr 2026 — The Works Minister opened the first 15 km of concrete pavement on 2 Apr 2026; the remaining sections are under construction. Partly open 2026 Roads & Bridges ·₦100.8bn for Section III (Enugu, 61 km) ·↳ began under Jonathan Enugu–Port Harcourt Expressway Reconstruction/Dualisation Federal reconstruction of the Enugu–Umuahia–Aba–Port Harcourt dual carriageway in Enugu, Abia and Rivers states, in several sections handled by contractors including CGC, Arab Contractors and CCECC. The Abia sections were first awarded around 2014; work has continued under the Tinubu administration. Partly open · Feb 2026 — In February 2026 Works Minister Umahi said President Tinubu would inaugurate the Aba–Port Harcourt section in May 2026, after the Aba axis was reported 79.15% complete in December 2025. Partly open 2026 Rail ·↳ began under Buhari Kaduna–Kano standard-gauge railway The ~200 km Kaduna–Zaria–Kano standard-gauge line will complete a continuous Abuja–Kano railway. The Transport Minister said it was 15% complete when the current administration took office and 53% complete by July 2025. On 23 October 2026 the ministry put it at 90%, with land compensation in Kaduna metropolis delaying the link from Jaji to the Abuja–Kaduna line. Under construction · Oct 2026 — On 23 Oct 2026 the ministry reported 90% completion, with about 10 km left on the inspected stretch and compensation disputes holding up the Jaji link. Under construction · 90% 2026 Roads & Bridges ·₦75bn approved Jan 2023 (3 sections at ₦25bn each, NNPC tax credit) ·↳ began under Buhari Obajana Junction–Benin (Lokoja–Benin) Road Dualisation Federal dualisation of the Obajana Junction–Okene–Auchi–Ekpoma–Benin trunk road in Kogi and Edo states, in four sections. After the original Sections II–IV contracts were terminated for non-performance, they were re-awarded on continuously reinforced concrete pavement and flagged off in February 2025. Under construction · Jan 2026 — At a January 2026 inspection a presidential aide faulted slow progress; Section I (CGC, Phases I & II) stood at 38.04% complete. Under construction 2026 Oil & Gas ·Estimated US$25bn (whole pipeline) ·↳ began under Buhari Nigeria–Morocco Gas Pipeline (African Atlantic Gas Pipeline) Planned gas pipeline of about 5,660–6,900 km from Nigeria along the West African coast to Morocco, developed by NNPC and Morocco's ONHYM. It was agreed in 2016 under President Buhari; an MoU with ECOWAS followed in 2022, and an intergovernmental agreement was signed in July 2026. No final investment decision has been taken, and the Nigerian alignment has not been published. Approved · Jul 2026 — In July 2026 an intergovernmental agreement on the pipeline was signed at the ECOWAS summit in Freetown, Sierra Leone; no final investment decision has been reported. Approved 2026 Oil & Gas ·↳ began under Buhari Obiafu–Obrikom–Oben (OB3) gas pipeline A ~127 km gas pipeline linking the eastern and western gas networks, from Obiafu-Obrikom in Rivers State to Oben in Edo State. NNPC reported in August 2025 that a 113 km section had been commissioned and was carrying about 300 MMscf/d. On 30 April 2026 it said the River Niger crossing was complete, unlocking the pipeline's 2 bcf/d design capacity. Partly open · Apr 2026 — The River Niger crossing was completed on 30 Apr 2026; commissioning of full end-to-end flows had not been separately confirmed. Partly open
▦ Nothing in the register matches those filters.
Cross-linked

The record next door

Attribution is by the president under whose tenure a project was completed (or is being delivered); a “began under” note marks work inherited from a predecessor. Every entry links to a government or verified-press source.