Goodluck Ebele Jonathan
Delivered under · 2010 – 2015 · PDP

Goodluck Ebele Jonathan

Inherited Yar'Adua's unfinished agenda mid-term. Delivered the power-sector privatisation — PHCN's generation and distribution companies sold for $2.53bn, handed over in November 2013 — plus Almajiri model schools across the north and the Abuja–Kaduna railway build that Buhari commissioned in 2016.

18
Projects tracked
14
Completed
1
Under way
7
Sectors
Signature project
★ The landmark of this tenure

Power Sector Privatisation (PHCN unbundling)

PHCN was unbundled into 18 successor companies (6 GenCos, 11 DisCos and the state-retained Transmission Company of Nigeria), and the sale of 14 of them raised about $2.53bn ($1.27bn GenCos, $1.26bn DisCos). New owners took over the privatised GenCos and DisCos on 1 November 2013, and more than 47,000 PHCN staff were paid severance.

Power & Energy 2013 $2.53bn (asset sale proceeds) Nationwide (former PHCN generation and distribution assets)
The Record

What Jonathan delivered

Every tracked project completed or commissioned on this watch — newest first. Each links to its government or press source.

2023 Power & Energy ·$1.3bn Zungeru Hydropower Project (700 MW) — construction commenced Construction of the 700 MW Zungeru hydropower plant on the Kaduna River, Niger State, began under President Jonathan in 2013, with a CNEEC–Sinohydro consortium as contractor and a $1.3bn cost financed 75% by a China EXIM Bank loan and 25% by the federal government. Construction was completed in 2023, and operations were handed to concessionaire Penstock Ltd (Mainstream Energy Solutions) on 23 January 2024. Completed 2022 Aviation & Ports 4-Airport Terminal Modernisation — China EXIM framework (Lagos, Abuja, Kano, Port Harcourt) China EXIM Bank-financed programme announced by Aviation Minister Stella Oduah in September 2012 to build new international terminals at Lagos, Abuja, Kano and Port Harcourt, with CCECC as contractor; construction began in late 2013. The terminals were completed under Buhari: Port Harcourt (Oct 2018), Abuja (Dec 2018) and Lagos (Mar 2022), with Kano reported complete by March 2022. Completed 2021 Rail ·$1.487bn (contract sum) ·↳ began under Obasanjo Lagos-Ibadan SGR contract award ($1.487bn) In July 2012 the Federal Executive Council approved, and the government signed, a $1.487bn contract with CCECC for the 156 km Lagos–Ibadan double-track standard-gauge line, renewing CCECC's 2006 Lagos–Kano award. Funding delays held up works until construction began in March 2017 under Buhari, and the line was commissioned in June 2021. Completed 2016 Rail ·~$874m ($500m China EXIM loan) Abuja-Kaduna SGR construction commences Construction of the 186.5 km Abuja (Idu)–Kaduna standard-gauge line, Nigeria's first new SGR build, began on 20 February 2011, with CCECC as contractor. It was financed by a $500m China EXIM preferential buyer's credit signed in December 2010, with the federal government funding the balance of the roughly $874m cost. Civil works were completed in December 2014 and commercial service began on 28 July 2016 under Buhari. Completed 2015 Education & Social ·~₦15bn (allocated) Almajiri / Tsangaya Model Schools Programme Federally funded model boarding schools across northern states combining Qur'anic and basic education, launched by President Jonathan at Gagi, Sokoto State, on 10 April 2012 and delivered through UBEC, with about ₦15bn invested out of a planned 400 schools. Many of the schools were later found decaying, under-used or converted to conventional schools. Stalled 2015 Major Reforms Subsidy Reinvestment and Empowerment Programme (SURE-P) Launched in January 2012 after the partial petrol subsidy removal that set off the Occupy Nigeria protests, to reinvest the federal share of subsidy savings in infrastructure and social programmes. Its projects included funding for the East-West Road dualisation, maternal and child health and graduate internship schemes. Completed 2015 Power & Energy ·↳ began under Obasanjo National Integrated Power Project (NIPP) — 10 power plants Ten federally funded gas-fired power plants (Olorunsogo II, Omotosho II, Calabar, Geregu II, Egbema, Alaoji, Ihovbor, Sapele II, Gbarain and Omoku II), conceived in 2004 under Obasanjo and largely built and commissioned during the Jonathan tenure. NDPHC station data give about 4,890 MW ISO-rated capacity for nine of the plants, with Geregu II rated at 434 MW. The plants are owned and operated by the Niger Delta Power Holding Company (NDPHC). Completed 2014 Major Reforms Nigeria Industrial Revolution Plan (NIRP) 2014 Federal industrial policy launched in 2014 by the Federal Ministry of Industry, Trade and Investment to raise manufacturing's share of the economy. Completed 2013 Power & Energy ·$2.53bn (asset sale proceeds) Power Sector Privatisation (PHCN unbundling) PHCN was unbundled into 18 successor companies (6 GenCos, 11 DisCos and the state-retained Transmission Company of Nigeria), and the sale of 14 of them raised about $2.53bn ($1.27bn GenCos, $1.26bn DisCos). New owners took over the privatised GenCos and DisCos on 1 November 2013, and more than 47,000 PHCN staff were paid severance. Completed 2012 Major Reforms 2012 Petrol Subsidy Removal (partial) On 1 January 2012 the federal government removed the petrol subsidy, and pump prices rose from ₦65 to at least ₦141 per litre, setting off the Occupy Nigeria protests and a nationwide strike. On 16 January President Jonathan announced a partial reversal of the price rise, and the subsidy was not fully removed until 2023. Completed 2012 Major Reforms ·$1bn seed capital Sovereign Wealth Fund Act 2011 — NSIA The NSIA (Establishment) Act, signed in May 2011, created the Nigeria Sovereign Investment Authority to invest surplus oil revenue through three funds: the Stabilisation Fund, the Future Generations Fund and the Nigeria Infrastructure Fund. NSIA began operations in October 2012 with $1bn seed capital. Completed 2012 Roads & Bridges ·Concession: ₦4bn initial investment; FG expects ₦23bn over 30 years (2022) Onitsha River Port – rehabilitation and 30-year concession The Onitsha inland river port in Anambra State was built in 1983 but lay unused until the Jonathan administration rehabilitated and commissioned it in 2012. In July 2022 it was concessioned for 30 years to Universal Elysium Consortium, which pledged an initial ₦4bn investment. Operations remain seasonal and depend on River Niger water levels. Completed 2011 Telecom & Digital ·Insurance-funded (failed NigComSat-1 cost $257m) ·↳ began under Yar'Adua NigComSat-1R replacement satellite Replacement for NigComSat-1, which failed in orbit in 2008, launched on 19 December 2011 on a Chinese Long March rocket from Xichang. The insurer of the first satellite paid for it; it has a 15-year design life and operates at 42.5°E. Completed 2010 Major Reforms ·₦4.02tn NPLs (book value) bought for ₦1.76tn ·↳ began under Yar'Adua Asset Management Corporation of Nigeria (AMCON) Act 2010 Proposed after the CBN's 2009 bank interventions under President Yar'Adua and signed into law by President Goodluck Jonathan on 19 July 2010, after Yar'Adua's death in May 2010. AMCON bought non-performing bank loans with a book value of about ₦4.02tn for about ₦1.76tn, paid in zero-coupon bonds, and capitalised three bridge banks. Completed 2010 Aviation & Ports Total Radar Coverage of Nigeria (TRACON) Total Radar Coverage of Nigeria (TRACON), a Nigerian Airspace Management Agency project to provide radar surveillance of Nigerian airspace and modern air-traffic systems at Nigerian airports. It was commissioned by President Goodluck Jonathan on 18 October 2010. Completed 2012 Power & Energy ·$5.792bn (2017 EPC contract) ·↳ began under Obasanjo Mambilla Hydropower Project (3,050 MW) — 2012 settlement and re-scoping In 2012 the Jonathan government revived the long-delayed Mambilla project on the Mambilla Plateau, Taraba State: capacity was re-scoped to 3,050 MW, and a settlement and General Project Execution Agreement was signed with Sunrise Power and its Chinese partners in November 2012. The current $5.792bn EPC contract with a CGGC–Sinohydro–CGCOC consortium was approved by the FEC in 2017 under Buhari, and no main construction has started. Stalled 2011 Aviation & Ports Remodelling of 22 federal airports Programme begun in 2011 under Aviation Minister Stella Oduah to rehabilitate terminals at 22 federal airports. A first phase of terminal facelifts was carried out, but by 2016 only 6 of 192 second-phase contracts were reported completed, leaving a reported ₦174bn debt overhang. The new China EXIM-financed international terminals are a separate entry. Stalled 2006 Roads & Bridges ·↳ began under Obasanjo East-West Road dualisation (Warri–Port Harcourt–Oron) Dualisation of the roughly 338 km East-West Road from Effurun (Warri) through Kaiama, Ahoada, Port Harcourt and Eket to Oron, in four sections, awarded in 2006. SURE-P funding from 2012 lifted overall completion from 47% to 82% by December 2014; remaining sections, including the Eleme–Onne reconstruction, are still being completed. Partly open
Receipts

Where this comes from

34 citations across 33 sources — 9 government, 24 verified press.
T ThisDay 2 projects cited Press AV AFP via Phys.org 1 project cited Press A AMCON 1 project cited Press AR African Review 1 project cited Press AE AidData (China EXIM loan record) 1 project cited Press AA AllAfrica (ICC award, Sep 2026) 1 project cited Press BO Bureau of Public Enterprises 1 project cited Gov B BusinessDay 1 project cited Press CT Channels TV 1 project cited Press CS Christian Science Monitor 1 project cited Press DT Daily Trust 1 project cited Press DT Daily Trust – FG concessions Onitsha River Port for N4bn, targets N23bn revenue in 30yrs 1 project cited Press EC Economic Confidential — President Jonathan signs AMCON bill 1 project cited Press FA Federal Airports Authority of Nigeria 1 project cited Gov FM Federal Ministry of Industry, Trade and Investment 1 project cited Gov FM Federal Ministry of Niger Delta Affairs (SURE-P East-West Road statement) 1 project cited Gov FM Federal Ministry of Niger Delta Affairs (SURE-P statement) 1 project cited Gov NO Nairametrics (ICRC on capacity, Oct 2026) 1 project cited Press NT Nairametrics (handover to concessionaire) 1 project cited Press NP National Point 1 project cited Press NL NigComSat Ltd 1 project cited Gov ND Niger Delta Power Holding Company (NDPHC) 1 project cited Press NS Nigeria Sovereign Investment Authority 1 project cited Press NA Nigerian Airspace Management Agency 1 project cited Gov PT Premium Times – Onitsha Port welcomes first barge in 2025 1 project cited Press RT Railway Technology 1 project cited Press SR Sahara Reporters 1 project cited Press SH State House (Lagos terminal commissioning speech) 1 project cited Gov SH State House (Port Harcourt terminal commissioning speech) 1 project cited Gov V Vanguard 1 project cited Press WN Wikipedia (Occupy Nigeria) 1 project cited Press WP Wikipedia (SURE-P) 1 project cited Press WN Wikipedia — Nnamdi Udoh (TRACON commissioning) 1 project cited Press