Bola Ahmed Tinubu
Delivered under · 2023 – now · APC

Bola Ahmed Tinubu

Removed the petrol subsidy and unified the naira's exchange rate within weeks of taking office. The flagship Lagos–Calabar Coastal Highway has its 103 km Lagos stretch open to traffic, with $1.87bn of financing closed for Sections 1 and 2 in 2025, while states take over their own electricity markets under the Electricity Act.

54
Projects tracked
22
Completed
25
Under way
11
Sectors
Signature project
★ The landmark of this tenure

Lagos–Calabar Coastal Highway

A planned ~750 km six-lane concrete coastal highway from Lagos to Cross River, renamed the President Bola Ahmed Tinubu Coastal Highway in July 2026. Section 1 (47.47 km, Victoria Island–Eleko) is complete, and the Lagos stretch of Sections 1 and 2 (about 103 km) has been opened to traffic while bridges are still being built; sections in Akwa Ibom and Cross River are also in progress.

Roads & Bridges 2024 $747m (Sec 1, Jul 2025) + $1.126bn (Sec 2, Dec 2025) financing closed Coastal corridor: Lagos, Ogun, Ondo, Delta, Edo, Bayelsa, Rivers, Akwa Ibom, Cross River; Section 1 runs Victoria Island–Eleko, Lagos
The Record

What Tinubu delivered

Every tracked project completed or commissioned on this watch — newest first. Each links to its government or press source.

2026 Aviation & Ports Akanu Ibiam International Airport, Enugu – PPP concession to Aero Alliance PPP concession of Enugu's Akanu Ibiam International Airport to Aero Alliance Limited, which will finance, rehabilitate, expand, operate and manage the airport. The Federal Executive Council approved the concession on 31 July 2025, the agreement was signed in January 2026, and the airport was formally handed over in June 2026. Completed 2026 Major Reforms ·₦4.65tn new capital raised by 33 banks Bank Recapitalisation 2024–2026 A CBN circular in March 2024 raised minimum bank capital to ₦500bn (international), ₦200bn (national) and ₦50bn (regional), with a 31 March 2026 deadline. On 1 April 2026 the CBN said 33 banks had met the new thresholds after raising ₦4.65tn, 72.55% of it from domestic investors. A limited number of banks remain under regulatory or judicial processes; Nairametrics named Unity Bank (merging with Providus) and Union Bank (whose acquisition is under judicial review). Completed 2026 Major Reforms National Single Window (trade portal) A single digital portal for import and export permits, licences, certificates and electronic cargo manifests. It links Customs, the NPA, NAFDAC, SON, NIMASA, the CBN, the NRS and other agencies. President Tinubu launched the project in 2024, and the platform went live on 27 March 2026. Completed 2026 Power & Energy Ihovbor/Benin and Ihovbor/Ajaokuta 330kV Turn-In-Turn-Out Lines (TCN) A TCN project linking the existing Benin–Ajaokuta 330kV line to the Ihovbor transmission substation in Edo State through about 14 km of new 330kV double-circuit line on 30 towers, built by Energo Nigeria. TCN says it allows about 600 MW of extra power from the Azura and NDPHC Ihovbor plants to be evacuated. Completed 2026 Aviation & Ports ·₦46bn approved for second-runway rebuild Kano (MAKIA) domestic terminal remodelling The aviation minister, Festus Keyamo, inaugurated the remodelled Muhammadu Adamu Dankabo Domestic Terminal at Mallam Aminu Kano International Airport in late July 2026. The FG also approved ₦46bn to resurface and rebuild the airport's second runway. Completed 2026 Power & Energy ·Apapa Road and Ijora works funded by JICA and the World Bank Lagos Transmission Substation Upgrades – Apapa Road, Ijora, Alausa, Lekki (TCN) Upgrades at four TCN transmission substations in Lagos: Apapa Road, Ijora, Alausa and Lekki. Eight new power transformers (840 MVA in total) and a new gas-insulated substation at Apapa Road add about 672 MW of transmission capacity to the Lagos grid; TCN said the Apapa Road and Ijora works were sponsored by JICA and the World Bank respectively. Completed 2025 Major Reforms ·Minimum capital ₦10bn (life), ₦15bn (non-life), ₦35bn (reinsurance) Nigerian Insurance Industry Reform Act (NIIRA) 2025 President Tinubu signed the Nigerian Insurance Industry Reform Act on 31 July 2025, repealing the Insurance Act and four other insurance laws. It set minimum capital at ₦10bn for life insurers, ₦15bn for non-life and ₦35bn for reinsurers, with 12 months for existing firms to comply. After the 31 July 2026 deadline NAICOM confirmed that 43 firms (41 insurers and 2 reinsurers) had met the requirements, with eight more under final verification. Completed 2025 Major Reforms Investments and Securities Act (ISA) 2025 Signed on 29 March 2025, the Act repealed the Investments and Securities Act 2007. It classifies virtual and digital assets as securities under SEC oversight, strengthens SEC powers and the Investments and Securities Tribunal, and creates frameworks for commodity exchanges and warehouse receipts. Completed 2025 Major Reforms Tax Reform Acts 2025 (Nigeria Tax Act, Tax Administration Act, NRS Act, JRB Act) On 26 June 2025 President Tinubu signed four tax laws: the Nigeria Tax Act, Nigeria Tax Administration Act, Nigeria Revenue Service (Establishment) Act and Joint Revenue Board (Establishment) Act. They consolidate fragmented tax laws, create a tax ombudsman and rename the FIRS as the Nigeria Revenue Service. The main acts took effect on 1 January 2026. Completed 2025 Aviation & Ports Bilateral Air Services Agreements (2023–2025) Since 2023 the aviation ministry has signed or amended several Bilateral Air Services Agreements. These include Kuwait (approved by the FEC on 7 September 2023 and signed in Saudi Arabia after COP28 in December 2023) and an amended UAE agreement, signed in Abu Dhabi on 12 February 2025, that widened codesharing and interlining. Completed 2024 Major Reforms ·₦70,000/month National Minimum Wage — ₦70,000/month President Tinubu signed the National Minimum Wage (Amendment) Act 2024 on 29 July 2024, after negotiations with the NLC and TUC. It raised the national minimum wage from ₦30,000 to ₦70,000 a month and cut the review cycle from five years to three. Completed 2024 Education & Social ·₦372.62bn disbursed (to 29 Sep 2026) Student Loan (Access to Higher Education) Act and NELFUND President Tinubu signed the Student Loan Act in June 2023, and on 3 April 2024 signed the Student Loan (Access to Higher Education) Act 2024, which repealed it and dropped the family-income threshold and guarantor requirements. The Act set up the Nigerian Education Loan Fund (NELFUND), which lends for tuition and upkeep to students of approved tertiary and vocational institutions; its portal opened in May 2024. By 29 September 2026 NELFUND reported ₦372.62bn disbursed: ₦192.89bn in fees to 319 institutions and ₦179.73bn in upkeep to students. Completed 2024 Rail ·₦21.4bn station access roads; $30m arrears paid to CCECC ·↳ began under Buhari Abuja Rail Mass Transit (light rail) restart The Abuja light rail was first commissioned in 2018 but fell idle and was vandalised after COVID-19. President Tinubu relaunched commercial operations on Lots 1 and 2 on 29 May 2024, after the FG spent ₦21.4bn on station access roads and the CBN helped pay $30m owed to contractor CCECC. Rides were free until the end of 2024. Completed 2024 Rail ·↳ began under Buhari Port Harcourt–Aba narrow-gauge rail service The rehabilitated 62 km Port Harcourt–Aba section of the Eastern (Port Harcourt–Maiduguri) narrow-gauge line was inaugurated by Transport Minister Said Alkali on 30 April 2024, with free rides from 1 to 4 May and commercial operations from 7 May 2024. It is the first section of the 1,443 km Eastern line rehabilitation by CCECC, awarded under the previous administration, to return to service. Completed 2024 Roads & Bridges ·↳ began under Buhari Third Mainland Bridge Rehabilitation Federal rehabilitation of the 11.8km Third Mainland Bridge in Lagos. A first phase (July 2020 – February 2021) replaced expansion joints and bearings and resurfaced the deck under partial closures. Further work replaced all expansion joints and removed accumulated surface layers that had added dead load to the bridge. Completed 2024 Roads & Bridges ·Funded via tax credit (Dangote) ·↳ began under Buhari Apapa–Oshodi–Oworonshoki–Ojota Expressway Reconstruction Reconstruction of the 36.02km federal expressway linking Apapa and Tin Can Island ports to Oworonshoki and Ojota in Lagos, using continuously reinforced concrete pavement. Built by Dangote Industries (with Hitech as subcontractor) under the road infrastructure tax credit scheme, it was flagged off in 2018 and inaugurated in May 2024. Completed 2024 Water & Dams ·Part of the US$495.3m World Bank TRIMING credit covering four schemes ·↳ began under Jonathan Bakolori Irrigation Scheme Rehabilitation (TRIMING) Rehabilitation of the federal Bakolori Irrigation Scheme in Zamfara State under the World Bank-financed Transforming Irrigation Management in Nigeria (TRIMING) project. TRIMING also rehabilitated the Kano River, Hadejia Valley and Dadin Kowa schemes. Because of insecurity, Bakolori's scope was cut from 13,000 ha to 7,258 ha. Completed 2024 Power & Energy ·$1.3bn build cost; concession $70m/yr for 30 years ·↳ began under Jonathan Zungeru Hydropower (700 MW) — concession and handover The 700 MW Zungeru hydropower plant on the Kaduna River in Niger State was built with a $1.3bn project funded partly by China Exim Bank. It was declared complete in May 2023 under the previous administration. Under President Tinubu, the BPE signed a 30-year, $70m-a-year concession with Penstock Limited on 13 December 2023 and handed the plant over on 23 January 2024. Completed 2024 Roads & Bridges ·85% China Exim Bank loan; Mararaba–Keffi CHEC section ₦73.9bn (NNPC tax credit) ·↳ began under Buhari Abuja–Keffi–Akwanga–Lafia–Makurdi Road Expansion and Dualisation Federal expansion of Abuja–Keffi and dualisation of Keffi–Akwanga–Lafia–Makurdi (225.4km) by China Harbour Engineering Company, funded 85% by a China Exim Bank loan. Completed in 2024 and tolled from February 2025 under a 25-year operate-and-maintain concession. A further Mararaba–Keffi (Section I) expansion is being built by CHEC and JRB. Partly open 2023 Major Reforms Petrol Subsidy Removal President Tinubu declared the end of the petrol subsidy in his inaugural speech on 29 May 2023. On 31 May 2023 NNPC raised pump prices to between ₦488/L and ₦557/L depending on location (₦488 in Lagos, ₦537 in Abuja), citing more than $6bn in outstanding subsidy claims. Completed 2023 Major Reforms Naira Floatation (FX Unification) On 14 June 2023 the CBN merged all official foreign-exchange segments into the Investors & Exporters window, letting market forces set the rate. The naira, long pegged at about ₦460/$1, traded as weak as ₦750–755/$1 during the first day before closing at ₦664/$1. Completed 2023 Power & Energy Electricity Act 2023 — state electricity markets Signed in June 2023, the Act lets states legislate for and regulate their own electricity markets. NERC completed the first transfers of regulatory oversight to Enugu and Ekiti on 22 October 2024 and Ondo on 23 October 2024. By February 2026, 15 states had taken over their markets: Enugu, Ekiti, Ondo, Imo, Oyo, Edo, Kogi, Lagos, Ogun, Niger, Plateau, Abia, Anambra, Nasarawa and Bayelsa; Akwa Ibom followed in August 2026. Completed 2026 Roads & Bridges ·₦111bn approved for Section I (Jul 2026) Akwanga–Jos–Bauchi–Gombe–Maiduguri Superhighway A 700 km, five-section superhighway from Akwanga through Jos, Bauchi, Gombe and Biu to Maiduguri, billed as the administration's fourth legacy highway. Section II (Gombe–Biu) was flagged off on 4 June 2026, and Section I (Akwanga–Jos, 125 km) on 1 July 2026, when the President was represented by APC National Chairman Nentawe Yilwatda and ₦111bn was approved for Section I. Started 2026 Roads & Bridges ·£746m UKEF-backed facility via Citibank Apapa and Tin Can Island ports reconstruction The FG secured a £746m buyer-credit facility backed by UK Export Finance and arranged by Citibank. It will rebuild quays and jetties at Lagos Port Complex (Apapa) and Tin Can Island and deepen the draft from about 13 m to at least 16 m. Officials said works would begin in Q2 2026 and take 48 months; no physical start has been confirmed. Approved 2026 Roads & Bridges ·₦548.98bn (FEC, Apr 2026); ₦5.6bn design consultancy approved Mar 2026 Carter Bridge Demolition and Reconstruction (Lagos) Federal demolition and replacement of the ageing Carter Bridge linking Lagos Island and the mainland, after technical reviews found its underwater piles and pile caps beyond repair. The new 1.93 km bridge, awarded to CCECC after competitive bidding, adds a flyover ramp and two 105 m navigation spans. Under construction 2026 Water & Dams ·$500m (World Bank) Sustainable Power and Irrigation for Nigeria (SPIN) project A $500m World Bank-financed project run by the Federal Ministry of Water Resources and Sanitation. It aims to modernise irrigation, improve dam operations and safety, and support hydropower development, building on the earlier TRIMING project. The FG and World Bank inaugurated it on 10 March 2026. Started 2025 Roads & Bridges ·₦454bn (Section 1) + ₦685bn (Section 2) contract sums Calabar–Ebonyi–Benue–Nasarawa–Abuja Superhighway A legacy superhighway from Calabar through Ebonyi, Benue, Kogi and Nasarawa towards Abuja. Section 1 (118.85 km at flag-off, now given as 123 km, Calabar to the Ebonyi–Benue boundary) was flagged off at Afikpo on 16 April 2025 by Governor Francis Nwifuru on behalf of President Tinubu. Section 2 (178 km, through Benue, Kogi and Nasarawa to Owete) has commenced, and a second carriageway is being procured. Under construction 2025 Power & Energy ·Up to ₦4trn authorised; ₦1.23trn issued (Jan & Aug 2026) Power Sector Debt Reduction Programme (₦4trn bonds) In July 2025 President Tinubu backed up to ₦4trn of FG-backed bonds to clear verified debts owed to power generation companies and gas suppliers, accumulated mainly from 2015 to 2023. Issued through NBET, Series 1 (₦501bn, January 2026) and Series 2 (₦728.9bn, August 2026, including ₦326.9bn of non-cash bonds) total ₦1.23trn so far. The first coupon, about ₦63.5bn, was paid on 14 July 2026. Started 2025 Telecom & Digital ·$2bn total; World Bank $500m, AfDB $200m, EBRD $100m, EU €22m grant Project BRIDGE — 90,000 km national fibre backbone A $2bn open-access programme to lay about 90,000 km of new fibre-optic cable nationwide. Financing comes from the World Bank ($500m, approved October 2025), EBRD ($100m), a €22m EU grant and AfDB ($200m, April 2026), plus private capital. In August 2026 the FG incorporated the delivery company, Bridge Open Access, with the government holding 25–49% and private investors at least 51%; physical rollout has not started. Approved 2024 Roads & Bridges ·$747m (Sec 1, Jul 2025) + $1.126bn (Sec 2, Dec 2025) financing closed Lagos–Calabar Coastal Highway A planned ~750 km six-lane concrete coastal highway from Lagos to Cross River, renamed the President Bola Ahmed Tinubu Coastal Highway in July 2026. Section 1 (47.47 km, Victoria Island–Eleko) is complete, and the Lagos stretch of Sections 1 and 2 (about 103 km) has been opened to traffic while bridges are still being built; sections in Akwa Ibom and Cross River are also in progress. Partly open 2024 Roads & Bridges Sokoto–Badagry Superhighway A 1,068 km six-lane greenfield highway planned to run from Sokoto through Kebbi, Niger, Kwara, Oyo and Ogun to Badagry (Lagos), built by Hitech Construction. Works are under way in Sokoto and on Section II in Kebbi (Km 120–378, 258 km), which was inaugurated on 25 October 2024. Under construction 2024 Oil & Gas Naira-for-Crude Supply to Domestic Refineries Since October 2024 NNPC has sold crude to the Dangote Refinery priced at international benchmarks but paid in naira, to reduce foreign-exchange pressure. The first six-month pilot ended in March 2025 while talks on a new contract continued, and the scheme was still running in 2026. In March 2026 Dangote said it was receiving only about 30% of its required volumes under the arrangement. Completed 2024 Housing Renewed Hope Cities and Estates (housing programme) A Federal Ministry of Housing and Urban Development programme launched on 8 February 2024 with the 3,112-unit Renewed Hope City at Karsana, Abuja. It also plans cities in Lagos (2,500 units) and Kano (1,500 units) and smaller Renewed Hope Estates in states, delivered partly through public-private partnerships. In January 2026 the ministry said the Abuja, Lagos and Kano cities were due for commissioning soon and that Maiduguri, Enugu and Port Harcourt would be added. Under construction 2023 Oil & Gas ·Budget: ₦100bn (2023), ₦130bn (2024), ₦225bn (2025); $2bn+ private investment Presidential CNG Initiative (Pi-CNG) A programme launched in 2023, after subsidy removal, to make compressed natural gas a cheaper transport fuel through conversion kits, conversion centres, refuelling stations and CNG buses. By January 2026 Pi-CNG reported more than 100,000 vehicles and 4,600 tricycles running on CNG and 379 conversion centres, and it had deployed 160 CNG buses to transport unions and state mass-transit firms by January 2025. Station rollout lagged the 2025 targets; the goal is 1 million CNG vehicles by 2027. Started 2023 Major Reforms ·₦7.28tn collected (2025) Customs revenue and modernisation drive (Adeniyi era) Bashir Adewale Adeniyi was appointed acting Comptroller-General of Customs in June 2023. Customs reported ₦6.1tn in revenue in 2024 and ₦7.28tn in 2025, beating the 2025 target of ₦6.58tn. The service credits digital tools, better compliance and enforcement, and Customs is a lead agency on the National Single Window. Started 2021 Oil & Gas ·$1.5bn rehabilitation (FEC-approved 2021) ·↳ began under Buhari Port Harcourt Refinery rehabilitation and restart After a $1.5bn rehabilitation approved by the FEC in 2021, NNPC announced on 26 November 2024 that the Port Harcourt refinery had resumed production. NNPC shut it on 24 May 2025 for what was billed as 30-day maintenance, and it had not restarted by mid-2026. On 30 April 2026 NNPC signed an MoU with China's Sanjiang Chemical and a Fuzhou industrial-park operator to complete rehabilitation and run the Port Harcourt and Warri refineries. Stalled 2021 Rail ·↳ began under Buhari Kano–Katsina–Maradi standard-gauge railway A standard-gauge line from Kano via Daura and Katsina to Maradi in Niger Republic, with a branch to Dutse, built by Mota-Engil and begun under the previous administration; the FG provides 15% counterpart funding. In August 2026 the ministry said the Kano–Katsina corridor was more than 75% complete and due for commissioning in December 2026, with the extension to Maradi expected by the end of 2027. Under construction 2020 Oil & Gas ·About US$5bn per ThisDay (some outlets cite up to US$10bn) ·↳ began under Buhari NLNG Train 7 (Bonny) Seventh liquefaction train at Nigeria LNG's Bonny Island plant, which will raise capacity from 22 to about 30 million tonnes per annum. NLNG is a joint-venture company, not a government agency: NNPC Ltd holds 49%, Shell 25.6%, TotalEnergies 15% and Eni 10.4%. Under construction · 92% 2015 Roads & Bridges ·₦23bn original contract (2015) ·↳ began under Jonathan Suleja–Minna Road Dualisation and Reconstruction Federal dualisation of the Suleja–Minna road in Niger State was flagged off in February 2015 and awarded to Salini Nigeria with a 48-month completion period. In June 2025 the Works Minister declared sections one and two emergency projects and terminated Salini's contract over failed work. The road was later redesigned as a concrete pavement, and the 7.9 km Maje–Dikko section is being delivered under the NNPC tax-credit scheme. Under construction 2009 Power & Energy ·Over ₦100bn spent by 2019 (Daily Trust) ·↳ began under Yar'Adua Kaduna (Kudenda) 215MW Power Plant A 215MW federal thermal power plant in Kaduna, built for the Federal Ministry of Power. General Electric and Rockson Engineering won the contract in November 2009. Work stopped around 2018/2019, leaving the plant unfinished for years. The Tinubu administration resumed it, and the 330kV Kudenda–Mando line to evacuate its power was still being built in 2025. Under construction · 87% 2007 Roads & Bridges ·Section III (Azare–Potiskum) ₦45bn Kano–Maiduguri Road Dualisation Federal dualisation and reconstruction of the Kano–Shuwarin–Azare–Potiskum–Damaturu–Maiduguri trunk road, executed in five sections. Sections II and III were inaugurated in December 2021; the Section I (Kano–Shuwarin) contract, awarded in 2007, was terminated in 2024 and re-awarded in 2025. Partly open 2002 Roads & Bridges ·₦74.649bn revised sum (2017, per Federal Controller of Works); about ₦28bn released by Jan 2026 ·↳ began under Obasanjo Kaduna Eastern Bypass (dual carriageway) A new dual-carriageway bypass east of Kaduna metropolis, running from the Kachia road to Mararaban Jos on the Kaduna–Zaria road, with several bridges including the 324 m Chikaji bridge. It was first awarded in 2002, re-approved by the Federal Executive Council in February 2017 and placed under Sukuk funding; Eksiogullari Construction is the contractor. Partly open · 57% 1979 Industry & Steel ·$1.5–2bn estimated revival cost (Jul 2026); no deal signed Ajaokuta Steel Company Revival Efforts to revive the Ajaokuta Steel complex in Kogi State, which has not produced liquid steel since it was established in 1979. In 2026 the Ministry of Steel Development signed a 20-year gas sale and purchase agreement with NNPC, began a technical audit of the plant, and said it was in advanced talks with a Chinese company on a $1.5–2bn revival deal. Stalled 2026 Aviation & Ports ·₦92.12bn FEC approval (Mar 2022); contractor sought about ₦532bn; minister now cites nearly ₦400bn ·↳ began under Yar'Adua Nnamdi Azikiwe International Airport, Abuja – Second Runway A second runway at Abuja's Nnamdi Azikiwe International Airport, first awarded to Julius Berger in 2009 at ₦64bn and revoked in 2010. It was re-awarded to CCECC, and the FEC approved ₦92.12bn in March 2022, but the project stalled after the contractor sought a review to about ₦532bn, which the government rejected. President Tinubu approved CCECC's return to site in 2026. Contract awarded 2026 Roads & Bridges ·₦56bn for one 53 km section (Sep 2025 report) Abuja–Lokoja Highway Reconstruction Federal reconstruction and rehabilitation of the Abuja–Lokoja highway in sections. These include the 47 km Kotonkarfe–Abaji (Abuja-bound) carriageway, Section 4A and the Lokoja–Ganaja road, mostly in concrete pavement. Under construction 2026 Roads & Bridges ·₦187bn for the remaining 96 km (FEC, May 2025) Benin–Ore–Shagamu Expressway Reconstruction Federal reconstruction of the Shagamu–Ore–Benin dual carriageway, currently on the Shagamu/Iperu Junction–Ajebandele stretch linking Ogun towards Ondo, with CBC as contractor. After an earlier 24km (12km per carriageway) section from the Shagamu Interchange, the Federal Executive Council awarded the remaining 48km per carriageway (96km in total) to CBC for ₦187bn in May 2025. Under construction 2025 Water & Dams Dasin Hausa Dam (Lagdo buffer dam) Proposed federal multipurpose dam at Dasin, Fufore LGA, Adamawa State, meant to buffer floods from releases at Cameroon's Lagdo Dam. It is planned to produce more than 300 MW and irrigate about 150,000 hectares across Adamawa, Taraba and Benue, and is being pursued as a public-private partnership through the ICRC. Planned 2026 Roads & Bridges ·About ₦18bn underwater-repair contract + ₦12bn emergency intervention proposed (Jun 2026) Eko Bridge Rehabilitation and Stabilisation (Lagos) Federal repairs to the Eko Bridge in Lagos. The bridge was closed after a March 2022 fire at its Apongbon section and reopened in July 2023 after 15 months of joint federal and Lagos State work. In May 2026 inspections found about eight badly damaged piles, which officials blamed on miners and scavengers, and one carriageway was shut for emergency repairs. Under construction 2026 Roads & Bridges ·Over ₦350bn total reconstruction (ministry figure) ·↳ began under Buhari Enugu–Onitsha Expressway reconstruction A 72 km section of the Enugu–Onitsha Expressway is being rebuilt in reinforced concrete after years of delay under an earlier MTN tax-credit arrangement. Works Minister David Umahi opened the first completed 15 km on 2 April 2026. Other stretches, including an 18 km section towards Anambra and a 39 km section from the Niger Bridge axis, are still under construction. Partly open 2026 Roads & Bridges ·₦100.8bn for Section III (Enugu, 61 km) ·↳ began under Jonathan Enugu–Port Harcourt Expressway Reconstruction/Dualisation Federal reconstruction of the Enugu–Umuahia–Aba–Port Harcourt dual carriageway in Enugu, Abia and Rivers states, in several sections handled by contractors including CGC, Arab Contractors and CCECC. The Abia sections were first awarded around 2014; work has continued under the Tinubu administration. Partly open 2026 Rail ·↳ began under Buhari Kaduna–Kano standard-gauge railway The ~200 km Kaduna–Zaria–Kano standard-gauge line will complete a continuous Abuja–Kano railway. The Transport Minister said it was 15% complete when the current administration took office and 53% complete by July 2025. On 23 October 2026 the ministry put it at 90%, with land compensation in Kaduna metropolis delaying the link from Jaji to the Abuja–Kaduna line. Under construction · 90% 2026 Roads & Bridges ·₦75bn approved Jan 2023 (3 sections at ₦25bn each, NNPC tax credit) ·↳ began under Buhari Obajana Junction–Benin (Lokoja–Benin) Road Dualisation Federal dualisation of the Obajana Junction–Okene–Auchi–Ekpoma–Benin trunk road in Kogi and Edo states, in four sections. After the original Sections II–IV contracts were terminated for non-performance, they were re-awarded on continuously reinforced concrete pavement and flagged off in February 2025. Under construction 2026 Oil & Gas ·Estimated US$25bn (whole pipeline) ·↳ began under Buhari Nigeria–Morocco Gas Pipeline (African Atlantic Gas Pipeline) Planned gas pipeline of about 5,660–6,900 km from Nigeria along the West African coast to Morocco, developed by NNPC and Morocco's ONHYM. It was agreed in 2016 under President Buhari; an MoU with ECOWAS followed in 2022, and an intergovernmental agreement was signed in July 2026. No final investment decision has been taken, and the Nigerian alignment has not been published. Approved 2026 Oil & Gas ·↳ began under Buhari Obiafu–Obrikom–Oben (OB3) gas pipeline A ~127 km gas pipeline linking the eastern and western gas networks, from Obiafu-Obrikom in Rivers State to Oben in Edo State. NNPC reported in August 2025 that a 113 km section had been commissioned and was carrying about 300 MMscf/d. On 30 April 2026 it said the River Niger crossing was complete, unlocking the pipeline's 2 bcf/d design capacity. Partly open
Receipts

Where this comes from

105 citations across 104 sources — 26 government, 78 verified press.
N Nairametrics 2 projects cited Press AH AllAfrica — Housing ministry to prioritise completion of ongoing projects in 2026 (Jan 2026) 1 project cited Press AN AllAfrica — NNPC raises petrol price to between N488–N557 after subsidy removal 1 project cited Press AN Arise News — National Single Window platform now fully operational 1 project cited Press AN Arise News — Nigeria, Kuwait sign bilateral aviation agreement 1 project cited Press BF Blueprint – FG inspects, commissions bypass roads, other emergency projects in Kaduna 1 project cited Press BT Blueprint – Tinubu inaugurates newly constructed Apapa–Oworonshoki–Ojota–Oshodi Expressway (May 2024) 1 project cited Press BN BusinessDay — NNPC commissions 113km portion of OB3 gas pipeline project (Aug 2025) 1 project cited Press BN BusinessDay — Naira closes at N664 as Nigeria attempts FX unification 1 project cited Press DT Daily Trust (opinion series) – Ajaokuta: The road back from grave (III) 1 project cited Press DT Daily Trust Foundation 1 project cited Press DT Daily Trust – Abuja airport runway: Contractor to return to site (Apr 2026) 1 project cited Press DT Daily Trust – FG boosts Lagos region with 208MW 1 project cited Press DT Daily Trust – FG boosts South Eastern economy through PPP, signs Enugu Airport concession – ICRC 1 project cited Press DT Daily Trust – FG commissions 330kV transmission lines in Edo, adds 600MW to national grid 1 project cited Press DT Daily Trust – FG completes handover of Enugu airport to concessionaires 1 project cited Press FF FMINO — FG advances landmark project with strong impact on Kebbi, North-West communities 1 project cited Gov FF FMINO — FG coastal highway warning over safety breaches in Lagos State (24 Sep 2026) 1 project cited Gov FF FMINO — FG, World Bank launch SPIN project to boost irrigation, power and food security 1 project cited Gov FK FMINO — Kaduna–Kano rail project reaches 90% completion, says Adebiyi (Oct 2026) 1 project cited Gov FK FMINO — Kano–Katsina rail project over 75% complete, FG reaffirms December 2026 commissioning 1 project cited Gov FP FMINO — President Tinubu launches construction of 3,112-unit Renewed Hope City in Abuja (Feb 2024) 1 project cited Gov FT FMINO — Tinubu flags off Akwanga–Plateau–Bauchi–Gombe road (2 Jul 2026) 1 project cited Gov FU FMINO — Umahi inaugurates Section II of Sokoto–Badagry Superhighway (Oct 2024) 1 project cited Gov FU FMINO — Umahi inspects Tinubu's legacy projects in Ebonyi (May 2026) 1 project cited Gov FM Federal Ministry of Information – Aba axis of Enugu–Port Harcourt Expressway nears reality, 79.15% completion (Dec 2025) 1 project cited Gov FM Federal Ministry of Information – FG flags off dualisation of Ajaokuta Junction–Okene–Okpella–Auchi–Ekpoma–Benin road (Feb 2025) 1 project cited Gov FM Federal Ministry of Information – FG reaffirms commitment to timely delivery of Abuja (Mararaba)–Keffi road (May 2025) 1 project cited Gov FM Federal Ministry of Information – FG to complete reconstruction of Carter Bridge within 24 months 1 project cited Gov FM Federal Ministry of Information – Work on the Minna–Suleja road project to commence on 16 March 2026 1 project cited Gov IH ICRC – Hope as FG moves to fast-track Dasin Hausa Dam (Mar 2025) 1 project cited Gov K Kpler 1 project cited Press LF Leadership – FG terminates Section 1 of Kano–Maiduguri road contract (Aug 2024) 1 project cited Press LF Leadership – Federal Govt plans N30bn intervention, stabilises Eko Bridge, starts Carter 1 project cited Press LG Leadership – Govt inaugurates emergency, special intervention roads in Kaduna (Jan 2026) 1 project cited Press LM Leadership – Match new 672MW transmission capacity with evacuation, Tegbe tells Lagos DisCos 1 project cited Press LM Leadership – Minister gives ultimatum on Suleja–Minna road (Sep 2026) 1 project cited Press LO Leadership – Over 100 airlines collapse in Nigeria, Abuja runway cost hits N400bn – Keyamo 1 project cited Press LN Leadership — NERC hands over Akwa Ibom electricity market regulation to AKSERC 1 project cited Press M MoneyCentral 1 project cited Press NN NAICOM — Nigerian Insurance Industry Reform Act 2025 (Official Gazette No. 146, Act No. 14) 1 project cited Gov NO NAN — Over 4,600 tricycles, 100,000 vehicles run on CNG in Nigeria – PiCNG (Jan 2026) 1 project cited Press NA Nairametrics – Ajaokuta Steel revival deal with Chinese firm due before end of 2026 – FG 1 project cited Press NF Nairametrics – FEC approves N187 billion for remaining 96km of Benin–Shagamu–Ore road (May 2025) 1 project cited Press NF Nairametrics – FG drops CCECC on Port Harcourt-bound section over poor work (Oct 2025) 1 project cited Press NA Nairametrics — Apapa, Tin Can ports £746 million rehab sparks efficiency debate (2 Apr 2026) 1 project cited Press NC Nairametrics — CBN announces unification of all exchange rate windows (14 Jun 2023) 1 project cited Press NC Nairametrics — CBN says 33 banks meet recapitalization target (1 Apr 2026) 1 project cited Press NC Nairametrics — CNG stations rollout lags 2025 target despite $2bn investment (19 Feb 2026) 1 project cited Press NF Nairametrics — FG completes $1.3bn Zungeru hydropower project (16 May 2023) 1 project cited Press NF Nairametrics — FG finally hands over $1.3bn Zungeru hydroelectric power plant to private operator (20 Feb 2024) 1 project cited Press NF Nairametrics — FG inaugurates Port Harcourt–Aba rail project as train service commences (1 May 2024) 1 project cited Press NF Nairametrics — FG incorporates company to deliver 90,000km nationwide fibre network (9 Aug 2026) 1 project cited Press NF Nairametrics — FG raises ₦1.23 trillion to tackle ₦4 trillion GenCo debt (15 Sep 2026) 1 project cited Press NF Nairametrics — FG secures $200m AfDB loan for 90,000km fibre project (11 Apr 2026) 1 project cited Press NF Nairametrics — FG, World Bank inaugurate $500m SPIN project to boost irrigation, dam safety (10 Mar 2026) 1 project cited Press NF Nairametrics — Full list: 43 insurance, reinsurance companies that met NAICOM recapitalisation deadline (3 Aug 2026) 1 project cited Press NN Nairametrics — NELFUND student loan disbursements hit ₦372.62 billion (4 Oct 2026) 1 project cited Press NN Nairametrics — NNPC Limited confirms petrol price changes (31 May 2023) 1 project cited Press NN Nairametrics — NNPC clarifies reports on end of naira-for-crude initiative (11 Mar 2025) 1 project cited Press NN Nairametrics — NNPC completes OB3 River Niger crossing pipeline, unlocks 2bcf/d gas capacity (30 Apr 2026) 1 project cited Press NN Nairametrics — NNPC signs MoU with Chinese firms to restart Warri, Port Harcourt refineries (4 May 2026) 1 project cited Press NN Nairametrics — Nigeria, UAE amend BASA to expand codeshare agreements (12 Feb 2025) 1 project cited Press NP Nairametrics — Port Harcourt refinery 90% ready, can resume in one week – PENGASSAN (10 Feb 2026) 1 project cited Press NP Nairametrics — President Tinubu backs ₦4 trillion bond to resolve power sector liabilities (25 Jul 2025) 1 project cited Press NP Nairametrics — President Tinubu extends free rides on Abuja light rail until year's end (30 May 2024) 1 project cited Press NP Nairametrics — President Tinubu signs four tax reform bills into law (26 Jun 2025) 1 project cited Press NP Nairametrics — President Tinubu signs ₦70,000 new minimum wage into law (29 Jul 2024) 1 project cited Press NS Nairametrics — See 15 Nigerian states regulating their own electricity sector in 2026 (16 Apr 2026) 1 project cited Press NT Nairametrics — Tinubu signs Investment and Securities Act 2025 into law (29 Mar 2025) 1 project cited Press NC Nigeria Customs Service 1 project cited Gov PG Peoples Gazette – FG executed 70 road projects in Kano in two years (Jul 2026) 1 project cited Press PG Peoples Gazette – FG satisfied with quality, pace of work on Lagos–Ibadan Expressway: Umahi (Jan 2026; also covers Benin–Ofosu–Ore–Sagamu road) 1 project cited Press PG Peoples Gazette – Mararaba–Keffi Road: Umahi commends contractor (Jun 2026) 1 project cited Press PG Peoples Gazette – Tinubu inaugurates reconstructed Apapa–Oworonshoki–Ojota–Oshodi Expressway (May 2024) 1 project cited Press PG Peoples Gazette – Tinubu inaugurates reconstructed Apapa–Oworonshoki–Ojota–Oshodi Expressway (May 2024; also covers Third Mainland Bridge) 1 project cited Press PT Premium Times – FG may shut Eko Bridge carriageway 1 project cited Press PT Premium Times – Federal govt approves N548.98bn to demolish, rebuild Carter Bridge in Lagos 1 project cited Press PT Premium Times – TCN inaugurates 330kV transmission lines in Edo to boost power supply 1 project cited Press PT Premium Times — CBN concludes recapitalisation exercise as Nigerian banks raise ₦4.65 trillion 1 project cited Press RE Reuters – ECOWAS bloc signs agreement backing Nigeria–Morocco Atlantic gas pipeline (Jul 2026) 1 project cited Press SH State House — Commuters to enjoy free train rides on Abuja metro line until year end 1 project cited Gov SH State House — In detail: The Student Loan (Access to Higher Education) Act, 2024 (4 Apr 2024) 1 project cited Gov SH State House — Kano–Jigawa–Katsina to Maradi railway project 60% completed (May 2026) 1 project cited Gov SH State House — Nigeria poised for landmark National Single Window launch on March 27 1 project cited Gov SH State House — Tinubu applauds USD 1.126bn financing for Phase 1 Section 2 (26 Dec 2025) 1 project cited Gov SH State House — Tinubu flags off Akwanga–Maiduguri superhighway (1 Jul 2026) 1 project cited Gov TA TechEconomy — Apapa, Tin Can port upgrade begins Q2 2026 after £746m UK deal 1 project cited Press TN The North Africa Post 1 project cited Press TW The Will – Third Mainland Bridge fully opened (Feb 2021) 1 project cited Press T ThisDay 1 project cited Press TD ThisDay — Dangote Refinery laments crude shortfall, says Nigeria supplying ~30% of needed volumes (26 Mar 2026) 1 project cited Press TF ThisDay — FG commences operation on Port Harcourt–Aba rail line (1 May 2024) 1 project cited Press TF ThisDay — FG flags off 118.85km Calabar–Ebonyi–Benue–Nasarawa–Abuja superhighway (17 Apr 2025) 1 project cited Press TF ThisDay — FG to open completed portion of 15km Enugu–Onitsha Expressway (24 Mar 2026) 1 project cited Press TF ThisDay — FIRS turns Nigeria Revenue Service as new tax laws take effect (1 Jan 2026) 1 project cited Press TK ThisDay — Kaduna–Kano rail to be completed in 2026, says minister (30 Jul 2025) 1 project cited Press TK ThisDay — Kano Airport: Keyamo inaugurates upgraded Muhammadu Adamu Dankabo Domestic Terminal (30 Jul 2026) 1 project cited Press TW ThisDay — Wale Adeniyi: Customs generated ₦7.28 trillion revenue in 2025 (27 Jan 2026) 1 project cited Press VO Voice of Nigeria 1 project cited Gov VO Voice of Nigeria – Nigerian Govt urges Abuja–Lokoja road contractors to meet deadline (Jan 2026) 1 project cited Gov VO Voice of Nigeria — Works Minister commissions sections of Enugu–Onitsha Expressway (2 Apr 2026) 1 project cited Gov WB World Bank – Restructuring Paper, Jan 2025 1 project cited Press WB World Bank – TRIMING project (P123112) 1 project cited Press
← Earlier tenure
Muhammadu Buhari
2015 – 2023 · APC
Later
Current administration
No successor yet
Back to the full register